logo

Tiniroto Road - Hangaroa Bluffs Bypass

Sector: Road • Location: New Zealand

Source: New Zealand Government Electronic Tenders Service (GETS)

Tender
Open

The Hangaroa Bluffs section of Tiniroto Road has been an ongoing maintenance, resilience and risk issue for Gisborne District Council over decades. The extreme weather events over the last few years triggered a number of failures causing significant rockfall/overslips and underslip damage. The most notable of these events being Cyclone Gabrielle which struck the Gisborne Tairāwhiti region in Febr

Status
Closed
Sector
Road, Cement, Steel, Government, Water Supply and Storage, Metal, Waste Processing and Treatment
Location
New Zealand
Updated
3 Nov 2026
Source
New Zealand Government Electronic Tenders Service (GETS)

ConstructChat

Ask ConstructChat about Tiniroto Road - Hangaroa Bluffs Bypass

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Tiniroto Road - Hangaroa Bluffs Bypass” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to New Zealand.

Participants

Not available for this record.

Status

Original status

open

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Hangaroa Bluffs section of Tiniroto Road has been an ongoing maintenance, resilience and risk issue for Gisborne District Council over decades. The extreme weather events over the last few years triggered a number of failures causing significant rockfall/overslips and underslip damage. The most notable of these events being Cyclone Gabrielle which struck the Gisborne Tairāwhiti region in February 2023, followed by a further rain event in June 2023.GDC are seeking to procure the construction of the Tiniroto Road - Hangaroa Bluffs Bypass which is due to commence in December 2025. GDC requires a Contractor who has the expertise, experience and resources to construct the proposed Tiniroto Road - Hangaroa Bluffs Bypass within budget and programme. The Contract Works includes but is not limited to:• The construction of approximately 1.8km of bypass road alignment away from the Hangaroa Bluffs• The upgrade/rebuild of approximately 0.7km of the existing Tiniroto Road• Construction of two new single lane bridges across the Hangaroa River - each being three-span bridges with twin steel girders made composite with a reinforced concrete deck, 91m in length and 4.5m wide between edge barriers, providing for a single lane of traffic.• Construction of all civil structures (i.e retaining walls, culverts and box culverts), earthworks, pavement, surfacing, barriers, stormwater drainage, signage, road furniture, pavement markings, and miscellaneous ancillary works for the extent of the new road realignment, the existing road upgrade/rebuild and the new bridges.• The location, protection and relocation of all existing services as required.Please refer to the attached tender documents for further information.

Location

Country

New Zealand

Source

Source

New Zealand Government Electronic Tenders Service (GETS)

URL

More Details

Record type

Tender

Sector

Road, Cement, Steel, Government, Water Supply and Storage, Metal, Waste Processing and Treatment

Article published date

2025-10-17

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender