logo
TenderAwarded Contract

To deliver Northampton Town Centre Public Realm Project (Abington St/Fish St Area)

The scope, dates and status of this tender. A free account opens every field.

Source: Contracts Finder

To deliver Northampton Town Centre Public Realm Project (Abington St/Fish St Area) RIBA 3 Prepare scope and responsibilities matrix for agreement with client Receive new topographical, GPR, geotechnical information and consider implications for Stage 2 design Support Cost Plan process (by others) Lead pre application discussions with planning department case officer and design/conservation off

Status
Closed
Sector
Road, Waste Processing and Treatment
Location
United Kingdom
Updated
3 Nov 2026
Source
Contracts Finder

ConstructChat

Ask ConstructChat about To deliver Northampton Town Centre Public Realm Project (Abington St/Fish St Area)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “To deliver Northampton Town Centre Public Realm Project (Abington St/Fish St Area)” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

awarded contract

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

To deliver Northampton Town Centre Public Realm Project (Abington St/Fish St Area) RIBA 3 Prepare scope and responsibilities matrix for agreement with client Receive new topographical, GPR, geotechnical information and consider implications for Stage 2 design Support Cost Plan process (by others) Lead pre application discussions with planning department case officer and design/conservation officers Engagement with Disability Panel to ensure that proposals comply with original design intent and are DDAcompliant. As Planning Consent is expected to be granted at the end of the process, address potential changes which may berequired to the evolving design. Design development of the concept design proposals to a Developed Design level (RIBA Stage 3). Provide asufficiently detailed pack of information to allow cost checks by the QS. Interface with utilities framework on drainage provision and below ground works (to drainage engineers details) Interface with appointed traffic engineer on vehicular, emergency access and servicing integration and anyTRO/Stopping Up applications required. Interface and liaison with any Heritage/Archaeologist regarding their Heritage Impact Assessment Prepare CGIs (one birds eye and at least 4 eye level visualisations) Produce consultation materials (printing to be done by others) Support one consultation and engagement process. Coordinate design team: engineering, lighting, art, civils, transport, drainage, MEP consultants. Develop levels for the external works (excl. highways) in collaboration with drainage, civil and structural engineers. Production of typical details for hard/soft landscape, site furniture and enclosures. All sub‐bases to engineers'specification. Planting plans including schedules with densities and sizes. Co‐ordinate lighting strategy/concept proposals with sub‐consultant Lighting Alliance Develop outline specification suitable for costing. Participate in project risk workshops (x2). Review of VE options. Assist in cost review (by others). Maximum one No.VE meeting face to face, all others to be remote. Input to artist's brief for public art (e.g proposed locations and types of installations). Procurement of artists byothers Production and collation from others of documentation and drawings to be formatted into a final Stage 3 report. Support Cost Plan No2 process (by others) Prepare a Design and Access Statement (DAS) and collate information to support planning/CA application (informedby pre‐application process and liaison with Client's appointed DDA specialist Gillespies will prepare responses received from statutory consultees and Council Officers up until determination ofthe application.

Location

Country

United Kingdom (UK)

Source

Source

Contracts Finder

URL

More Details

Record type

Tender

Sector

Road, Waste Processing and Treatment

Article published date

2025-12-16

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender