logo

To Replace a Variable Frequency Drive on a 2011 McQuay Centrifugal Cooler Chiller

The scope, dates and status of this tender. A free account opens every field.

Source: Mississippi Purchasing Group

Tender
Closed

1 . The proposed work to be performed includes the replacement of a variable frequency drive on a 2011 McQuay Centrifugal Cooler Chiller ( Model @# wsc063 ), 391 W . South St ., Hernando , MS 38632 . The project will include the following tasks : 2 . Provide mobilization needed for rigging and tools to the site .

Status
Closed
Sector
Manufacturing (Industrial)
Location
Mississippi, United States of America
Updated
3 Nov 2026
Source
Mississippi Purchasing Group

ConstructChat

Ask ConstructChat about To Replace a Variable Frequency Drive on a 2011 McQuay Centrifugal Cooler Chiller

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “To Replace a Variable Frequency Drive on a 2011 McQuay Centrifugal Cooler Chiller” is a tender record in Taiyo, linked to the Manufacturing (Industrial) sector. It is issued for works, goods, or services related to Mississippi, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

1 . The proposed work to be performed includes the replacement of a variable frequency drive on a 2011 McQuay Centrifugal Cooler Chiller ( Model @# wsc063 ), 391 W . South St ., Hernando , MS 38632 . The project will include the following tasks : 2 . Provide mobilization needed for rigging and tools to the site . 3 . Provide labor and materials to remove defective compressor VFD from the site . 4 . Provide and deliver new OEM , ABB , and VFD , selected per factory specs . 5 . Provide and paint custom adapter plates for mounting the new VFD . 6 . Modify all wiring and incoming line voltage to accommodate the new VFD . 7 . Start the new VFD and verify all chiller operations . Startup and controls will need to be scheduled with EK Automation . 8 . Specify warranty for parts and labor . 9 . All materials shall be installed according to manufacturer specifications . 10 . Selected contractor will be responsible for disposal of all materials in a safe and legal manner . 11 . The Contractor shall operate in a safe manner and will observe all OSHA guidelines . 12 . The work must be done during regular business hours or on a Saturday with prior notification and approval by the Facilities Director , Garrett Madero . 13 . The Contractor must submit a proposal that includes a timeline for this bid . 14 . This is a repair to an existing structure , when disassembling and installing the new VFD , if an unknown repair or modification is necessary DeSoto County will follow the MS Code 31 - 7 - 13 ( m ) guidelines .

Location

Country

United States of America (USA)

State

Mississippi

Source

Source

Mississippi Purchasing Group

URL

More Details

Record type

Tender

Sector

Manufacturing (Industrial)

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender