To Replace a Variable Frequency Drive on a 2011 McQuay Centrifugal Cooler Chiller
The scope, dates and status of this tender. A free account opens every field.
Source: Mississippi Purchasing Group
1 . The proposed work to be performed includes the replacement of a variable frequency drive on a 2011 McQuay Centrifugal Cooler Chiller ( Model @# wsc063 ), 391 W . South St ., Hernando , MS 38632 . The project will include the following tasks : 2 . Provide mobilization needed for rigging and tools to the site .
- Status
- Closed
- Sector
- Manufacturing (Industrial)
- Location
- Mississippi, United States of America
- Updated
- 3 Nov 2026
- Source
- Mississippi Purchasing Group
ConstructChat
Ask ConstructChat about To Replace a Variable Frequency Drive on a 2011 McQuay Centrifugal Cooler Chiller
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 . The proposed work to be performed includes the replacement of a variable frequency drive on a 2011 McQuay Centrifugal Cooler Chiller ( Model @# wsc063 ), 391 W . South St ., Hernando , MS 38632 . The project will include the following tasks : 2 . Provide mobilization needed for rigging and tools to the site . 3 . Provide labor and materials to remove defective compressor VFD from the site . 4 . Provide and deliver new OEM , ABB , and VFD , selected per factory specs . 5 . Provide and paint custom adapter plates for mounting the new VFD . 6 . Modify all wiring and incoming line voltage to accommodate the new VFD . 7 . Start the new VFD and verify all chiller operations . Startup and controls will need to be scheduled with EK Automation . 8 . Specify warranty for parts and labor . 9 . All materials shall be installed according to manufacturer specifications . 10 . Selected contractor will be responsible for disposal of all materials in a safe and legal manner . 11 . The Contractor shall operate in a safe manner and will observe all OSHA guidelines . 12 . The work must be done during regular business hours or on a Saturday with prior notification and approval by the Facilities Director , Garrett Madero . 13 . The Contractor must submit a proposal that includes a timeline for this bid . 14 . This is a repair to an existing structure , when disassembling and installing the new VFD , if an unknown repair or modification is necessary DeSoto County will follow the MS Code 31 - 7 - 13 ( m ) guidelines . |
Location
Country | United States of America (USA) |
State | Mississippi |
Source
Source | Mississippi Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Manufacturing (Industrial) |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Manufacturing (Industrial) tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Sole Source for a Hand Held Video Receiver System
- Security Hardware Services
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- PreQualification of Bidders for Chaboya Improvements
- Alonzo Babe James Community Center Playground Artificial Turf
- Prefabricated Manufactured Structures as Living Quarters for County Fire Personnel
