Tonopah Airport Concrete Slab
Closed · Nevada · Last reported Jan 2026
Source: Nevada Purchasing Group
DESCRIPTION OF WORK The work under this Contract includes mobilization and demobilization to and from the project site , as well as the removal of all equipment , materials , and debris from work locations upon project completion . The Contractor shall furnish all labor , equipment , materials , and services and a
- Status
- Closed
- Sector
- Airport, Steel, Cement, Automotive, Power Transmission, Power Generation (CCGT)
- Location
- Nevada, United States of America
- Updated
- 3 Nov 2026
- Source
- Nevada Purchasing Group
ConstructChat
Ask ConstructChat about Tonopah Airport Concrete Slab
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | DESCRIPTION OF WORK The work under this Contract includes mobilization and demobilization to and from the project site , as well as the removal of all equipment , materials , and debris from work locations upon project completion . The Contractor shall furnish all labor , equipment , materials , and services and account for applicable taxes , overhead , profit , and bonding requirements to perform the following tasks : 2 . 11 . 1 Mobilization and Site Preparation 2 . 11 . 1 . 1 Designation of area for material storage and equipment staging . 2 . 11 . 1 . 2 Delivery of necessary equipment , machinery , and materials to the job site . 2 . 11 . 1 . 3 Ensure proper storage , operation , and handling of vehicles , materials , tools , and equipment . 2 . 11 . 1 . 4 Initial setup of site safety ( fencing / lighting ) and implementation of safety measures ( signage / barriers ). 2 . 11 . 1 . 5 Utility Protection – Identifying and protecting existing utilities before construction begins . 2 . 11 . 2 Concrete Tank Foundation , Slab , and Protection Bollards 2 . 11 . 2 . 1 Construct forms , install rebar , set conduits for future connections , and embed anchor bolts as required by tank manufacturer . 2 . 11 . 2 . 2 Pour , spread , and finish the slab as required . The slab will be an estimated 55 ’ x 35 ’ x 4 ” concrete slab with four 10 ’ x 4 ’ x18 ” footings for the fuel tanks in accordance with the foundation exhibits , project specifications , manufacturer ' s recommendations , and the project geotechnical foundation report . Apply sealant for fuel resistance . 2 . 11 . 2 . 3 Install protective bollards around the tank to ensure safety and durability . 2 . 11 . 2 . 4 Apply yellow safety paint , protective coating or plastic covers and reflective tape on all bollards . 2 . 11 . 2 . 5 Material testing in compliance with project specifications standards . 2 . 11 . 3 Electrical Conduit Work 2 . 11 . 3 . 1 Identify conduit pathways and marking trench locations . Pathway must be approved by Nye County . 2 . 11 . 3 . 2 Place sand or gravel for conduit protection and backfilling after installation . Backfill material must meet project specifications . 2 . 11 . 3 . 2 Supply and install conduit , junction boxes , and stubs at the proper depth for future tank wiring , per Nye County ’ s direction and manufacturer ' s specifications . 2 . 11 . 3 . 3 Install tracing wire and pull strings for future wiring and seal all conduit ends . |
Location
Country | United States of America (USA) |
State | Nevada |
Source
Source | Nevada Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Airport, Steel, Cement, Automotive, Power Transmission, Power Generation (CCGT) |
Article published date | 2026-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Airport tenders in United States of America
- Fuel Tank Inspection and Repair Services
- Tacoma Narrows Airport TIW Taxiway Relocation Improvements Project
- Cargo Apron Reconstruction and Replacement of Runway 927 with a Taxiway
- Fall Protection for Airport Jet Bridges
- Notice of Intent to Award a NonCompetitive Procurement for Siemens Logistics High Speed Diverters
- This is a Notification Only Continuing OnCall Architecture and Engineering Consulting Services W00486
- Electronic Gate Replacement
- INFORMATION TECHNOLOGY IT CONTINUING CONSULTING SERVICES
