logo

Trail Construction RFP

The scope, dates and status of this tender. A free account opens every field.

Source: Montana Purchasing Group

Tender
Closed

Trail Clearing ( a ) This work consists of clearing , grubbing , and removal of rock and roots within the trail corridor . It includes trimming , removing , disposing of , or treating live and dead timber , construction slash , and debris within the trail limits as shown on EXHIBIT A - 1 , PROJECT AREA MAP indicated

Status
Closed
Sector
Forest Products and Packaging
Location
Montana, United States of America
Updated
3 Nov 2026
Source
Montana Purchasing Group

ConstructChat

Ask ConstructChat about Trail Construction RFP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Trail Construction RFP” is a tender record in Taiyo, linked to the Forest Products and Packaging sector. It is issued for works, goods, or services related to Montana, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Trail Clearing ( a ) This work consists of clearing , grubbing , and removal of rock and roots within the trail corridor . It includes trimming , removing , disposing of , or treating live and dead timber , construction slash , and debris within the trail limits as shown on EXHIBIT A - 1 , PROJECT AREA MAP indicated by on - site flagging . Protection of standing trees from damage or defacement is required , and damaged trees shall be treated or removed as directed by the City . ( b ) The cleared trail corridor shall conform to the dimensions shown on EXHIBIT B . ( c ) All debris , trees , logs , branches , brush , plants , rocks , roots , and other protruding obstructions within the clearing limits shall be removed and disposed of in accordance with subsection ( h ), except : • Live , sound , firmly rooted trees with a diameter at breast height ( DBH ) of three ( 3 ) inches or greater . • Live brush and herbaceous vegetation between the trailway and clearing limits that is less than twelve ( 12 ) inches in height and less than one - half ( ½ ) inch in diameter at ground line . ( d ) All limbs extending into the clearing limits shall be cut flush with the trunk or stem or cut at ground level . Where a tree is significantly limbed on one side , opposing limbs shall be removed to maintain balanced form . ( e ) Clearing operations shall not damage bark or standing timber . Any damage shall be repaired or mitigated to the satisfaction of the City . Trees rendered unstable due to exposed roots shall be felled and disposed of as specified ...

Location

Country

United States of America (USA)

State

Montana

Source

Source

Montana Purchasing Group

URL

More Details

Record type

Tender

Sector

Forest Products and Packaging

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender