Trail Hardening Mut, Lake Loop Section
Sector: Water Supply and Storage • Location: New Waverly, Texas, United States of America
Source: SAM.gov
- The contractor shall supply all material, labor, tools, equipment, supplies, incidentals and supervision to complete the project. 2. The contractor shall be responsible to verify the necessary quantities of materials to be supplied. It is suggested that the contractor visit the project site prior to turning in a proposal. 3. There are no utilities available at the project site. 4. All work shal
- Status
- Closed
- Sector
- Water Supply and Storage, Raw Materials, Commercial, Residential
- Location
- New Waverly, Texas, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Trail Hardening Mut, Lake Loop Section
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | solicitation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1. The contractor shall supply all material, labor, tools, equipment, supplies, incidentals and supervision to complete the project. 2. The contractor shall be responsible to verify the necessary quantities of materials to be supplied. It is suggested that the contractor visit the project site prior to turning in a proposal. 3. There are no utilities available at the project site. 4. All work shall be done in accordance with this document, the project plans, and the FP- 14. 5. All trash, debris, rags, water bottles and any other assorted refuse that is not material to be incorporated into the work shall be removed daily. 1. Disclosure of the Magnitude of Construction (FAR 36.204) In accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the magnitude of this construction project is estimated to be between $500,000 and $1,000,000. This magnitude range is provided solely for the purpose of assisting prospective offerors in determining their capability to perform the work. The magnitude range does not represent the Governments independent estimate. 2. Site Visit Offerors are strongly encouraged to visit the project site to familiarize themselves with local conditions that may affect the performance of the work. Contractors shall be responsible for investigating and satisfying themselves as to the conditions affecting the work, including but not limited to access, terrain, weather conditions, and other conditions which may impact the cost or performance of the work. Failure to visit the site will not relieve the contractor from responsibility for properly estimating the difficulty and cost of successfully performing the work. 3. Period of Performance The contractor shall complete all work required under this contract within 365 calendar days after receipt of the Notice to Proceed (NTP), unless otherwise specified in the contract. The contractor shall provide a proposed schedule within 10 calendar days after receipt of the Notice to Proceed outlining the anticipated sequence and duration of work activities. 4. Bonding Requirements In accordance with FAR 52.228-15, Performance and Payment Bonds¿Construction, the successful offeror shall furnish performance and payment bonds in the amount of 100 percent of the contract price. The required bonds shall be submitted to the Contracting Officer within 10 calendar days after receipt of the notice of award. 5. Differing Site Conditions Offerors are reminded that FAR 52.236-2, Differing Site Conditions, is incorporated into this solicitation and resulting contract. Contractors shall promptly notify the Contracting Officer in writing upon encountering subsurface or latent physical conditions at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract. QUESTIONS REGARDING THIS SOLICITATION ARE DUE THURSDAY APRIL 2, 2026. |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | Texas |
City | New Waverly |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Raw Materials, Commercial, Residential |
Article published date | 2026-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
