logo

Trail Reconstruction at Joppa Hill Conservation Area

Sector: Water Supply and Storage • Location: New Hampshire, United States of America

Source: New Hampshire Purchasing Group

Tender
Closed

The Town of Bedford ( Town ) is soliciting bids from qualified and insured contractors to regrade , rebuild , and control runoff on the existing trails at the Joppa Hill Conservation Area ( JHCA ). The intent of this RFP is to select a contractor that demonstrates technical expertise , environmental stewardship , a

Status
Closed
Sector
Water Supply and Storage, Raw Materials, Automotive
Location
New Hampshire, United States of America
Updated
3 Nov 2026
Source
New Hampshire Purchasing Group

ConstructChat

Ask ConstructChat about Trail Reconstruction at Joppa Hill Conservation Area

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Trail Reconstruction at Joppa Hill Conservation Area” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to New Hampshire, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Town of Bedford ( Town ) is soliciting bids from qualified and insured contractors to regrade , rebuild , and control runoff on the existing trails at the Joppa Hill Conservation Area ( JHCA ). The intent of this RFP is to select a contractor that demonstrates technical expertise , environmental stewardship , and competitive pricing . SCOPE OF WORK The selected contractor will improve three trail segments in Bedford shown on Map 3 . Location of Trail Work . Proposals must include bids for all three segments in Bedford . Bedford Trail Segment 1 continues into Amherst . The Amherst Conservation Commission has already selected their contractor for the trail improvements in Amherst . Improvements on Bedford Segment 1 must complement improvements planned for Amherst . • Bedford Segment 1 - 510 feet long • Bedford Segment 2 - 575 feet long • Bedford Segment 3 - 500 feet long The desired outcome is a trail surface suitable for strollers and wagons . The surface must withstand the operation of farm vehicles including tractors , animal trailers , and pickup trucks . Limited sections of the trails are periodically used as access for fence repair and forestry mowing . The work is expected to include : 1 ) trail grading and the addition of 4 to 12 inches of crushed gravel of varying size to level the trail surface and facilitate drainage ; 2 ) the addition of drainage features as needed , which may include rock , log , or belted water bars , drainage ditches , check dams , berms , or drain dips ; and 3 ) final grading and compaction of the tread surface with 4 to 6 inches of compact gravel or nit - pack . Tree removal is not anticipated . Tree branches may be removed for access , but no other tree removal is allowed without prior approval .

Location

Country

United States of America (USA)

State

New Hampshire

Source

Source

New Hampshire Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Raw Materials, Automotive

Article published date

2026-04-28

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender