Trailer Pad/Housing Unit Improvements On The Kaibab National Forest In Northern Az
Sector: Raw Materials • Location: Flagstaff, Arizona, United States of America
Source: SAM.gov
THE REQUEST FOR INFORMATION (RFI - QUESTIONS AND RESPONSES) IS POSTED AS AN ATTACHMENT. ANY CONTRACTOR WISHING TO SUBMIT A PRICE QUOTE MUST ACKNOWLEDGE THE AMENDEDMENT 0001 SOLICITATION WITH THEIR PRICING PACKAGE. TITLE OF NEWLY UPLOADED AMENDMENT DOCUMENT WITH RFI: "AMENDMENT_127EAX26Q0017_0001" ******************************************* Tra
- Status
- Prospective
- Sector
- Raw Materials, Commercial, Waste Processing and Treatment, Car parking, Residential, Automotive, Water Supply and Storage, Power Transmission, Power Generation (CCGT)
- Location
- Flagstaff, Arizona, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Trailer Pad/Housing Unit Improvements On The Kaibab National Forest In Northern Az
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | combined synopsis/solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | *****UPDATE AS OF 5-22-2026 10:40AM MOUNTAIN TIME***** THE REQUEST FOR INFORMATION (RFI - QUESTIONS AND RESPONSES) IS POSTED AS AN ATTACHMENT. ANY CONTRACTOR WISHING TO SUBMIT A PRICE QUOTE MUST ACKNOWLEDGE THE AMENDEDMENT 0001 SOLICITATION WITH THEIR PRICING PACKAGE. TITLE OF NEWLY UPLOADED AMENDMENT DOCUMENT WITH RFI: "AMENDMENT_127EAX26Q0017_0001" ******************************************* Trailer pad utility upgrades and improvements for the North Kaibab and Tusayan Ranger Districts - Housing & Utility upgrades (on-site housing for firefighters and staff). This project will consist of the rehabilitation of eleven (11) RV camping pads, six (6) at the Tanglefoot Work Center and five (5) at Tusayan Ranger Station. Pad rehabilitation consists of clearing overgrown pads; subgrade preparation, new gravel placement and compaction for parking pads; replacement of water and sewer connections; limited replacement of water and sewer lines; and replacement of electrical components on existing electrical service pedestals. This project also includes optional work items for the rehabilitation of an additional thirteen (13) RV pads, eight (8) at Jacob Lake Work Center and five (5) at Big Springs Work Center; subsurface utility locating; television inspection and flow testing of an existing septic system; replacement of septic tank and leach field; replacement or installation of propane lines and connections for twenty-four (24) RV pads; and additional water and sewer line replacement. |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | Arizona |
City | Flagstaff |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Raw Materials, Commercial, Waste Processing and Treatment, Car parking, Residential, Automotive, Water Supply and Storage, Power Transmission, Power Generation (CCGT) |
Article published date | 2026-05-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Raw Materials tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Hay Cutting and Removal for Jordan Farm and Coleman Farm
- Antiscalant Chemical
- As-Needed Sewer Inspection (FY23) [BID TABULATION]
- Landscaping (C-27 License), San Francisco, San Mateo, Santa ...
- Van Ness Avenue Auxiliary Water Supply System Upgredes
- Sunol Valley Water Treatment Plant Ozonation
- Oceanside Water Pollution Control Plant Digester Gas Utiliza...
