Transportation Services
Sector: Hydro • Location: Wisconsin, United States of America
Source: Wisconsin Purchasing Group
Specifications include , but are not limited to : A . The CONTRACTOR shall comply in full with Chapter 121 . 58 of the Wisconsin Statutes and any applicable rules and regulations of the Departments of Transportation and of Public Instruction , including any and all rules governing the design , construction , inspec
- Status
- Closed
- Sector
- Hydro, Education, Commercial, Residential, Road
- Location
- Wisconsin, United States of America
- Updated
- 3 Nov 2026
- Source
- Wisconsin Purchasing Group
ConstructChat
Ask ConstructChat about Transportation Services
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Specifications include , but are not limited to : A . The CONTRACTOR shall comply in full with Chapter 121 . 58 of the Wisconsin Statutes and any applicable rules and regulations of the Departments of Transportation and of Public Instruction , including any and all rules governing the design , construction , inspection and operation of school buses in existence or as adopted from time to time . B . Each yellow school bus carrying public or parochial pupils shall hold two ( 2 ) emergency evacuation drills during the school year . Such drills will follow guidelines which are developed by the CONTRACTOR and reviewed by the DISTRICT . One such evacuation drill shall be held prior to the last day of October , and another drill shall be held prior to the last day of April in accordance with the Wisconsin Handbook for School Bus Drivers . These drills shall be documented in writing indicating date , route number , driver ' s signature and number of students involved , and will be placed on file for DISTRICT review upon request . The District Administrator , or designee , may authorize any deviation or exception to this provision regarding special education students . Any such authorization must be in writing . It is the responsibility of the CONTRACTOR to determine dates and hold the drills each year . C . The CONTRACTOR shall report all discipline problems to the Building Principal of the student in the written form used for the Bus Conduct Report . The DISTRICT agrees to follow through on each Bus Conduct Report in accordance with applicable school board policy . D . The CONTRACTOR shall maintain a record of all eligible passengers on a perpetual basis during the school year and a copy of this record shall be kept on file by the CONTRACTOR for a minimum of two years after the completion of each school year . This record shall include the student ' s name , route assignment , student ' s home address , school location , shortest distance in miles between the student ' s home and school location , and whether the eligible student rode during the school year . |
Location
Country | United States of America (USA) |
State | Wisconsin |
Source
Source | Wisconsin Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Hydro, Education, Commercial, Residential, Road |
Article published date | 2026-05-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Hydro tenders in United States of America
- Landscaping (C-27 License), San Francisco, San Mateo, Santa ...
- Bay Corridor Transmission & Distribution - Phase 2 (2019) S...
- College Hill Reservoir Outlet Structure And Pipeline
- Bay Corridor Transmission and Distribution - Phase 3 (2019)
- Regional Groundwater Storage and Recovery
- Fillmore and Haight Street Intersection AWSS, Pavement, and ...
- REJECTED: Southeast Water Pollution Control Plant Power Feed...
- Turner Dam Spillway and Pond F3 East Erosion Repair
