Transverse road markings Innlandet 2027-2030
Sector: Road • Location: Norway
Source: TED Europa
The nature and scope of the work
The works include transverse road marking, as well as milling for removing road markings. Milling will make up a small part of the contract.
The contract area is the entire area of Innlandet County.
In the event of contradictions between information in the tender management tool and the attached documents (annex/annex), information in the documents (annex/annexe
- Status
- Closed
- Sector
- Road
- Location
- Norway
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about Transverse road markings Innlandet 2027-2030
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The nature and scope of the work The works include transverse road marking, as well as milling for removing road markings. Milling will make up a small part of the contract. The contract area is the entire area of Innlandet County. In the event of contradictions between information in the tender management tool and the attached documents (annex/annex), information in the documents (annex/annexes) applies before information in the tender management tool. The contract period is from 2027-2030. The builder and contractor have the mutual option to extend the contract for 1+1 year. Mutual option means that both parties must agree to an option/extension of the existing contract on the existing terms. It will not be possible to renegotiate the contract in connection with the exercise of the option. Any extension of the contract shall be agreed within 6 months before the ordinary operations period expires. The scopes given in chapter D (processes) and chapter E (quantity form) apply per year and are adjustable in accordance with NS 8406 point 19.1, fourth paragraph. The amounts are estimated on the basis of an average of previous years' experience. The contractor must reckon on large variations in the amount performed, as this is situational and, among other things, affected by unpredictable variables such as weather situation, wear, damage damage and financial awards. |
Original sector | Repair and maintenance services, Construction work, Construction work, Construction work, Construction work, Construction work, Transport equipment and auxiliary products to transportation, Construction work, Construction work, Construction work |
Location
Country | Norway |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Road |
Article published date | 2026-10-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
