logo

Tree Mitigation Work

Sector: Road • Location: Washington, United States of America

Source: Washington Purchasing Group

Tender
Closed

Contractor will provide mitigation work on 27 trees , with work to include full removal , snag creation , and / or mitigation work as well as the desired disposal method as identified in the Tree Risk Evaluation Spreadsheet ( Attachment A ). The City also has created a tree location map website for reference .

Status
Closed
Sector
Road
Location
Washington, United States of America
Updated
3 Nov 2026
Source
Washington Purchasing Group

ConstructChat

Ask ConstructChat about Tree Mitigation Work

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Tree Mitigation Work” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Washington, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Contractor will provide mitigation work on 27 trees , with work to include full removal , snag creation , and / or mitigation work as well as the desired disposal method as identified in the Tree Risk Evaluation Spreadsheet ( Attachment A ). The City also has created a tree location map website for reference . Portions of this work will need to include a traffic control plan and require right of way permits . The contractor is responsible for developing these plans and obtaining permits as outlined in this IBF . Tree permits will be obtained by the City prior to the project . A certified arborist must be onsite during all work performed and in accordance with ANSI Z1331 . All work must be performed on city property and right of ways with no access to or from private property without prior authorization . If access to private property is needed , the City will do initial outreach to property owners , trees designated with a “ dh ” in the Notify Column in Attachment A , that ’ s a door hanger and the City will do that before work commences . If there is any other note regarding calling property owner or notifying owner – that is something the vendor is going to want to do . The bid submittal sheet ( Attachment B ) includes a cost column for each individual tree , note this work is subject to prevailing wage requirements . Contractor is required to follow all applicable OSHA safety standards for this type of work . The City may choose to add additional trees requiring mitigation work to the awarded contractor , depending on available budgetary funds and project timeline . Any additional work would be accomplished via change order and will be incorporated into the existing purchase order / contract . Subcontractors : The City will not allow subcontracting for the actual tree mitigation ; however , subcontractors may be used regarding work such as traffic control . Notice regarding site visits : If your staff visits the site to prepare proposals / reports , please stay on public streets . Do not enter private property . The City of Redmond will be responsible for making initial contact as needed for any access needed to private property . Licenses and permits : City of Redmond will obtain , in advance , tree removal permits for each individual tree . The Contractor will be responsible for all traffic plans and right of way permits needed as detailed below . Right - of - Way Permit : The Contractor will need to apply for a no - cost Right - of - Way Use permit from the City of Redmond , which includes the review and approval of traffic control plans prepared by the Contractor . The Contractor should assume that they will be able to work in the street between the hours of 9 AM and 3 : 30 PM on weekdays . Depending on the street and the volume of traffic , the City may allow the Contractor to work outside of these hours during the course of the project . Any other permits , if necessary , are the responsibility of the Contractor . City shall assist in timely issuance of permits , and permit fees will be waived by the City . Traffic Plan Requirements : Any Contractor having employees working on or near a street shall comply with City of Redmond and Washington State regulations pertaining to safety equipment , warning signs , and traffic control . A City rightof - way permit is required before work can proceed . General traffic control plans must be submitted before a permit will be issued . Any work that requires a lane closure or work differing from the standard traffic control plans will require a site - specific traffic control plan . This plan must be submitted and approved prior

Location

Country

United States of America (USA)

State

Washington

Source

Source

Washington Purchasing Group

URL

More Details

Record type

Tender

Sector

Road

Article published date

2026-05-14

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender