logo

Tree Planting and Establishment

Bids closed May 2026 · Oregon · Last reported Apr 2026

Source: Oregon Purchasing Group

Tender
Closed

TREE PROCUREMENT AND TREE STOCK QUALITY a . TREE PROCUREMENT PROCESS i . The City will procure and furnish trees when available . 1 . The Contractor shall allow the City or nurseries to deliver trees to the Contractor ’ s facility prior to planting . 2 . The Contractor shall be responsible for unloading trees

Status
Closed
Sector
Metal, Wind, Warehouse, Car parking, Automotive, Road
Location
Oregon, United States of America
Updated
3 Nov 2026
Source
Oregon Purchasing Group

ConstructChat

Ask ConstructChat about Tree Planting and Establishment

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Tree Planting and Establishment” is a tender record in Taiyo, linked to the Metal sector. It is issued for works, goods, or services related to Oregon, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

TREE PROCUREMENT AND TREE STOCK QUALITY a . TREE PROCUREMENT PROCESS i . The City will procure and furnish trees when available . 1 . The Contractor shall allow the City or nurseries to deliver trees to the Contractor ’ s facility prior to planting . 2 . The Contractor shall be responsible for unloading trees from the City or nursery vehicles . 3 . The Contractor may suggest the rejection of a City - procured tree , but the final decision to accept or reject a tree is the responsibility of the City PM . 4 . All storage , unloading , and transportation of trees must meet the TREE STORAGE , TRANSPORTATION , AND HANDLING specifications found in the TREE PLANTING section of these specifications . 5 . Storage and unloading of trees procured by the City shall not be billed separately by the Contractor . Associated expenses should be accounted for in the Contractor ’ s pricing for STORAGE , TRANSPORTATION , AND INSTALLATION . 6 . Once a City - procured tree is unloaded and accepted at the Contractor ’ s facility , the Contractor is responsible for the care and maintenance of the tree . Should the tree fail or otherwise not meet the conditions required in the TREE STORAGE , TRANSPORTATION , AND HANDLING section of these specifications , the Contractor shall be required to procure a replacement at Contractor ’ s own cost . ii . In the event the City is unable to procure some or all required trees , the Contractor shall be responsible for procuring such trees . iii . The Contractor shall bill the City for tree procurement services performed by the Contractor for trees the City is unable to procure . The Contractor shall pay for approved trees and delivery and then bill the City for reimbursement of exact tree cost and nursery - toContractor - yard delivery through the invoicing process . The Contractor shall not bill the City for any trees procured and furnished directly by the City . iv . For trees procured by the Contractor , the following process will apply : 1 . The City PM shall specify the species , variety , and size in plans or tree schedule provided by the City PM . The City PM may also specify stock . Variances from the schedule may be approved by the City PM , at the City PM ’ s discretion . 2 . The Contractor shall broadcast tree material search lists to a minimum of 15 wholesale nurseries in the greater Portland region . Additional nurseries , located outside the greater Portland region , may be used . The Contractor shall provide the City PM with a list of nurseries contacted . At the City PM ’ s discretion , the Contractor may broadcast their search to fewer than 15 nurseries . 3 . The Contractor shall provide the City PM with a summary Procurement Report provided by the City PM ( Attachment 2 – Procurement Report Template ), showing tree material sizes and quantities available , along with unit prices from all responding nurseries by email for each project , prior to purchase . The Procurement Report shall include : a . Tree material sizes b . Stock type c . Quantities available d . Unit prices e . Nursery information 4 . Where specified trees are not available , Contractor shall submit to the City PM a list of all nurseries that were contacted , and a proposal for use of equivalent alternative material . If a specified tree type is available , but only a size different from that specified , the Contractor shall provide the City PM with a list of the sizes available . Final authorization for all substitutions shall be at the discretion of the City PM . 5 . The Contractor shall verify that tree quality for quoted material meets requirements of this specification and any additional project requirements prior to submitting quote to the City PM . 6 . The City PM shall decide from which source to procure the plant material . 7 . The Contractor shall work with each nursery to dig , pack , transport , and handle trees with care to ensure protection against injury . Tree crowns and trunks shall not be bound with material such as metal wire that will damage the bark , break branches , or in any way deform the tree . 8 . The Contractor shall ensure that each nursery lifts and handles trees with suitable support of the root ball to avoid damaging the root ball and roots , in addition to trunk , branches , and foliage . Trees shall not be bent in such a manner that damages limbs or bark . Trees shall not be dropped . 9 . During delivery of trees , Contractor shall ensure care is exercised to prevent injury and drying out of trees . Trees shall be covered when transported on open vehicles with a protective covering to prevent wind damage and desiccation . 10 . The Contractor shall be responsible for unloading trees from nursery vehicles . 11 . For specifications on storing trees , see STORAGE , TRANSPORTATION , and INSTALLATION section . b . TREE STOCK QUALITY i . All trees , whether procured by the City or the Contractor , must meet the following tree stock quality specifications . ii . All trees shall be grown in accordance with good horticultural practices and shall conform to the American Standard for Nursery Stock ANSI Z60 . 1 – 2014 , or most current version of this standard , published by AmericanHort . Tree stock quality shall also meet the PP & R Specifications for Nursery Tree Quality ( see ATTACHMENT 3 ). iii . Trees acquired shall be nursery - grown in a USDA hardiness zone suitable for the region . iv . Trees shall exhibit the following characteristics : 1 . Healthy and vigorous , with trunk and limbs free from insects , disease , defects , injuries , and decay . 2 . Single trunk that is straight , with a well - developed leader and good trunk taper . 3 . The trunk shall be solidly attached to the root ball . 4 . Well - distributed branches that are considerably smaller diameter than the trunk , with wide - angled branch attachments or branch attachments that are appropriate for the tree form . The City PM may specify lowest branching height in some cases . 5 . A fibrous root system with no girdling roots at or above the root collar . v . Bareroot trees : Bareroot trees shall have abundant root growth , with both larger anchor roots and smaller fibrous roots . Roots shall not be broken , torn , decayed , or damaged . Bareroot trees shall be planted prior to bud - break . vi . Balled and burlapped ( B & B ) trees : B & B trees shall have a firm root ball . The root ball shall not be loose , broken , or desiccated . The minimum root ball diameter shall be the same as those specified in American Standard for Nursery Stock ( ANSI Z60 . 1 – 2014 ). vii . Container trees : Roots shall be well - developed enough to hold the potting substrate together . The tree shall not be pot bound or have matted roots . The soil shall not be desiccated . viii . Fabric bag trees : The trunk shall be solidly attached to the root ball . The root ball shall not be broken or desiccated . c . TREE SIZE i . Broadleaf trees shall be measured by caliper size at six inches above the root flare . ii . Conifer size shall be measured by height from the base of trunk to the tip of the leader . d . NEONICOTINOIDS i . Trees shall not be treated with neonicotinoid pesticides , including but not limited to acetamiprid , clothianidin , imidacloprid , nitenpyram , nithiazine , thiacloprid and thiamethoxam . e . LABELING i . Each tree shall be labeled with a securely attached , loose - hanging , waterproof tag bearing legible designation of botanical and common name , including variety . The Contractor shall provide tag if one is not provided by the nursery . f . OBSERVATION i . The City reserves the right to observe trees both at their place of growth , any temporary holding site , and at the planting site for compliance with requirements for species type , variety , size , form , and quality . g . PROCUREMENT ACCEPTANCE i . The City may reject any materials or services that do not meet these standards , at the City PM ’ s discretion . ii . For City - procured trees , the Contractor may propose rejection of tree stock only at the time of delivery from the nursery , and only if the Contractor believes the nursery has failed to meet the tree quality , transportation , or handling requirements of this section . Upon delivery , the Contractor shall immediately notify the City PM of any proposed rejection . The City shall determine whether the tree is rejected and whether a replacement is required . If a tree is rejected at delivery , the City shall either procure the replacement tree or compensate the Contractor to procure the replacement . For Contractor - procured trees , procurement acceptance or rejection may occur at the time of planting or planting acceptance by the City . h . INVOICING FOR TREES PROCURED BY THE CONTRACTOR i . The Contractor shall invoice the City for procurement services only performed by the Contractor . The Contractor shall use the appropriate line item from the pricing sheet . The line item does not include tree material costs . ii . There shall be no more than one invoice per month per Task Order . iii . The City shall reimburse the Contractor for actual tree material cost ; no mark - up shall be allowed . Tree material cost is separate from procurement services . v . The City shall reimburse the Contractor only for tree delivery costs being charged by the nursery . If the contractor opts to pick up the trees rather than accept delivery from the nursery , they cannot invoice the City for any additional delivery costs or labor hours . v . The Contractor shall submit procurement invoice ( s ) with procurement services per tree procured ( as found in the line - item pricing sheet ) and itemized tree material purchase receipts as part of monthly invoicing . vi . Tree materials may not be purchased through a broker unless approved by the City PM . 11 . TREE PLANTING a . PLANTING SEASON i . The typical planting season will be November 1st through the following March 31st . The City PM may request plantings outside of this period . ii . Planting Schedule 1 . Contractor shall notify the City PM of the beginning date of planting . Contractor must provide at least two weeks ’ notice prior to the start date . 2 . Contractor shall provide the City PM a Planting Schedule two weeks before the planting season begins . The Planting Schedule shall include dates on when 25 % of trees will be planted , 50 % of trees will be planted , 75 % of trees will be planted , and 100 % of trees will be planted . Deviations from this schedule shall be sent to the City PM for approval so that appropriate City staffing can be arranged for proper project management . iii . At the start of each planting day , Contractor shall notify the City PM of the first location of the day . b . SPACE TYPES AND PRICING CATEGORIES i . Tree planting and establishment work will occur on two primary space types , as determined by the City PM : 1 . Direct - Access Spaces : Locations where work vehicles can generally park adjacent to the planting space . Examples include most street tree planting sites , front yards , and non - gated parking lot trees . Pricing for Direct - Access Space plantings shall include all labor , equipment , hoses , pumps , relays , materials handling , and time necessary to perform planting work where direct truck access is generally available . 2 . Limited - Access Spaces : Locations where vehicle access may be limited and where planting and watering may require extended hose runs , pumps , relays , hand transport of materials , or additional labor time . Examples include trees planted in backyards , large private properties away from paved paths , gated properties that require access logistics , and sloped landscapes ( excluding the right - of - way ). Pricing for Limited - Access Space plantings shall include all labor , equipment , hoses , pumps , relays , materials handling , and time necessary to perform planting work where direct truck access is not available . ii . The Contractor shall submit separate unit prices for Direct - Access Spaces and Limited - Access Spaces as specified in the line - item pricing sheet . Unit prices are further separated by tree stock size . Each unit price includes costs to unload , store , transport , and install a single tree .

Location

Country

United States of America (USA)

State

Oregon

Source

Source

Oregon Purchasing Group

URL

More Details

Record type

Tender

Sector

Metal, Wind, Warehouse, Car parking, Automotive, Road

Article published date

2026-05-11

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender