logo

Tss Ductless System At Ewr Atct

Solicitation · New Jersey

Source: SAM.gov

Tender
Solicitation

Mechanical · Install (3) indoor wall-mounted units, along with all refrigerant and drain piping. · Install (1) 6-ton heat pump. Unit to be anchored to exterior concrete wall via on L-bracket steel frame. · Coordinate core penetrations through concrete wall for piping, electrical, and drain lines. Installation to include all wall waterproofing. · Provide and insulate all refrigerants and condensate

Status
Closed
Sector
Airport, Cement, Steel, Power Generation (CCGT), Aerospace & Defense, Commercial, Residential
Location
New Jersey, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Tss Ductless System At Ewr Atct

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Tss Ductless System At Ewr Atct” is a tender record in Taiyo, linked to the Airport sector. It is issued for works, goods, or services related to New Jersey, United States of America.

Participants

Not available for this record.

Status

Original status

solicitation

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Mechanical · Install (3) indoor wall-mounted units, along with all refrigerant and drain piping. · Install (1) 6-ton heat pump. Unit to be anchored to exterior concrete wall via on L-bracket steel frame. · Coordinate core penetrations through concrete wall for piping, electrical, and drain lines. Installation to include all wall waterproofing. · Provide and insulate all refrigerants and condensate piping above ceiling · Test and charge system to verify operation. Electrical · Install new dedicated 208V, 3-phase power circuit · Provide NEMA 4X, 60A non-fused stainless steel disconnect at outdoor unit · Provide power and control conduit and wiring to/from all units · Penetrate concrete wall. · Provide penetration and conduit through roof deck. Patch and flash roof as required to maintain new roof warranty through Carlisle Roof installer. Controls · Integrate mini-split system into the existing FAA Schneider Electric EcoStruxure DDC system via BACnet · Provide and install one IP-IO module at VAV-17 for coordinated backup cooling enable/disable · Submit point list, graphics, and control narrative to COR for approval. · Program unit set points, and update AHU-3 supply air setpoints · Support commissioning of system to validate operation. Structural & Interior · Concrete core penetration for pipes and conduits · Provide support framing for all units and steel plates as shown in drawing. · Provide support for pipes and conduits. · Work to include wall restoration and painting. Site Visit - A site visit is scheduled for 03/17/26 at 3:00pm EST. If necessary, a secondary site visit will take place at 5:00pm EST. If interested in attending, notify the CO at elisha.distler@faa.gov NLT 03/11/26 at 5:00pm CST. Please provide the names of all attendees and limit the total personnel to three individuals per firm.

Original sector

Construction

Location

Country

United States of America (USA)

State

New Jersey

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Airport, Cement, Steel, Power Generation (CCGT), Aerospace & Defense, Commercial, Residential

Article published date

2026-04-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender