logo

Tub Refinishing Authority - Wide

One of 10,000+ tenders Taiyo tracks in Pennsylvania.

Source: Pennsylvania Purchasing Group

Tender
Closed

The Housing Authority of the City of Pittsburgh ( hereinafter referred to as “ HACP ”), is a federally funded public housing agency . The Housing Authority maintains over 2500 units of rental housing . HACP is issuing this Invitation for Bids (“ IFB ”) for qualified and interested business firms to submit sealed

Status
Closed
Sector
Waste Processing and Treatment, Warehouse, Water Supply and Storage, Commercial
Location
Pennsylvania, United States of America
Updated
3 Nov 2026
Source
Pennsylvania Purchasing Group

ConstructChat

Ask ConstructChat about Tub Refinishing Authority - Wide

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Tub Refinishing Authority - Wide” is a tender record in Taiyo, linked to the Waste Processing and Treatment sector. It is issued for works, goods, or services related to Pennsylvania, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Housing Authority of the City of Pittsburgh ( hereinafter referred to as “ HACP ”), is a federally funded public housing agency . The Housing Authority maintains over 2500 units of rental housing . HACP is issuing this Invitation for Bids (“ IFB ”) for qualified and interested business firms to submit sealed bids to provide Tub Refinishing Authority - Wide and other related work requested by HACP in accordance with Attachment 1 and 2 , titled “ Bid Sheet and “ Specifications .” Contractor will follow the below tub refinishing process and procedures : Surface Preparation & Application 1 . Contaminant Removal : Thoroughly scrape and remove all dirt , grease , soap , paint , and existing caulking to ensure a pristine working surface . 2 . Etching : Chemically etch the bathtub surface to facilitate maximum adhesion for the new porcelain coating . 3 . Surface Repair : Fill and smooth all damaged or worn areas to restore a uniform finish . 4 . Priming Phase : Apply three ( 3 ) separate coats of primer to achieve a consistent 1 mil thickness . 5 . Finishing Phase : Apply four ( 4 ) coats of polyurethane enamel ( with glass content ) to achieve a minimum thickness of 2 mil . 6 . Sealing : Re - caulk the entire perimeter of the bathtub using 100 % silicone sealant for a durable , water - tight finish . Resident & Site Coordination 1 . Resident Experience : Execute all work with a commitment to zero resident disruption and a peaceful living environment . 2 . Communication Flow : Provide proactive notification to Site Management prior to the start of any on - site activities . 3 . Resident Awareness : Ensure all residents are properly and timely notified regarding project schedules , unit access , and installation details . 4 . Safety & Air Quality : Maintain continuous exterior ventilation throughout the work process to ensure the safety and comfort of the building . 5 . Personal Property : Note that the contractor will not move resident furniture or personal belongings ; work areas should be prepped accordingly . Logistics & Timeline 1 . Responsiveness : Maintain adequate resources to initiate and complete refinishing within a 15 - day window of the initial service call . 2 . Project Duration : Once scheduled , all on - site work must be finalized within three ( 3 ) business days . 3 . Standard Hours : Conduct all work during regular business hours ( 8 : 30 AM – 4 : 30 PM ). 4 . Permitting : Secure and manage all required permits necessary for the completion of this scope . Site Cleanliness & Safety Compliance 1 . Product Safety : Provide all relevant MSDS documentation and strictly adhere to the recommended use and safety protocols for all products . 2 . Waste Management : Remove all project - related materials and debris from the site daily . 3 . Disposal Policy : Ensure no debris is placed in HACP trash receptacles ; all waste must be hauled off - site by the contractor . 4 . Final Condition : Leave all work areas in a clean , safe , and professional condition upon completion of the shift .

Location

Country

United States of America (USA)

State

Pennsylvania

Source

Source

Pennsylvania Purchasing Group

URL

More Details

Record type

Tender

Sector

Waste Processing and Treatment, Warehouse, Water Supply and Storage, Commercial

Article published date

2026-05-09

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender