logo

Tunnel Road Handrail

The scope, dates and status of this tender. A free account opens every field.

Source: North Carolina Purchasing Group

Tender
Closed

Description of Work : Replacement of approximately 240 feet of damaged steel handrail . The handrail shall conform to City of Asheville Standard Detail 3 . 35 . Replacement shall include the removal of the damaged handrail , repair of concrete that was damaged by the movement of the railing piers , installation

Status
Closed
Sector
Metal, Steel, Car parking, Cement, Tunnel, Power Transmission, Automotive, Power Generation (CCGT), Road
Location
North Carolina, United States of America
Updated
3 Nov 2026
Source
North Carolina Purchasing Group

ConstructChat

Ask ConstructChat about Tunnel Road Handrail

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Tunnel Road Handrail” is a tender record in Taiyo, linked to the Metal sector. It is issued for works, goods, or services related to North Carolina, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Description of Work : Replacement of approximately 240 feet of damaged steel handrail . The handrail shall conform to City of Asheville Standard Detail 3 . 35 . Replacement shall include the removal of the damaged handrail , repair of concrete that was damaged by the movement of the railing piers , installation and painting of the new handrail . The contractor shall install proper traffic control during the project . This will include a lane closure due to the work occurring within five feet of a travel lane . No . ITEM ESTIMATED QUANTITY UNIT UNIT PRICE AMOUNT 1 Pedestrian Safety Handrail ( COA Detail 3 . 35 ) 240 FT 2 Traffic Control / Dust Control 1 LS 3 Sidewalk Panel Replacement 5 ’ x5 ’ 23 EA 4 Mobilization / Demobilization / Utility protection 1 LS Replacement of approximately 240 feet of damaged steel handrail . The handrail shall conform to City of Asheville Standard Detail 3 . 35 . Replacement shall include the removal of the damaged handrail , repair of concrete that was damaged by the movement of the railing piers , installation and painting of the new handrail . The contractor shall install proper traffic control during the project . This will include a lane closure due to the work occurring within five feet of a travel lane . The contractor will be paid for the actual amount of guardrail installed . Measurement and Payment Bid Item No . 1 - Pedestrian Safety Handrail ( COA Detail 3 . 35 ) All materials and construction shall be compliant with NCDOT Specification Section 460 , Concrete and Metal Rails and all referenced NCDOT Sections therein . Payment for this item will be made at the Contract per linear foot price , which includes all labor , materials , equipment , testing , coordination , training , and work required to install approximately 240 Linear Feet of new steel handrail in accordance with Detail 3 . 35 included herein and NCDOT Specification Section 460 . The cumulative total shall not exceed the LF bid pay item amount . The handrail installation price shall include all work and materials to remove the existing damaged handrail , install the replacement handrail including painting , connecting to existing , sidewalk replacement , concrete boring for pier installation , and filling of removed or cut piers . Bid Item No . 2 - Traffic Control / Dust Control Payment for this item will be made at the Contract lump sum price , which includes all labor , materials , equipment , testing , coordination , training , and work required to design , permit , install , remove , adjust , maintain all Traffic Control and Dust Control at the site for the duration of the work performed from notice to proceed through final payment . The City reserves the right to require both Traffic Control adjustments or increased Dust Control based on credible public input . The contractor shall ensure that an ADA accessible pedestrian route is maintained through or around the workzone at all times . Bid Item No . 3 - Sidewalk Repair - Turn Down Footing Detail All materials and construction shall be compliant with NCDOT Specification 848 , Concrete Sidewalks , Driveways and Curb Ramps and all referenced NCDOT Sections therein . Payment for this item will be made at the Contract price for each sidewalk panel replaced , which includes all labor , materials , equipment , testing , coordination , excavation , backfilling ,, sawing the existing sidewalk , furnishing and placing concrete , sealant , training , and work required to remove the damaged , cracked , broken , full width and length sidewalk panel and to install new thickened edge sidewalk to replace the damaged sidewalk ready to accept the new steel handrail . The price shall include all costs associated with sidewalk removal and installation including broom finish , edging , curing , placing , jointing material , and sealant ( s ).

Location

Country

United States of America (USA)

State

North Carolina

Source

Source

North Carolina Purchasing Group

URL

More Details

Record type

Tender

Sector

Metal, Steel, Car parking, Cement, Tunnel, Power Transmission, Automotive, Power Generation (CCGT), Road

Article published date

2026-05-08

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender