Turnkey Eaton Ups Replacement & Installation
Sector: Energy Storage • Location: Fargo, North Dakota, United States of America
Source: SAM.gov
The 119th Wing (NDANG) in Fargo, ND is conducting market research under FAR Part 10 and FAR Part 12 to identify capable commercial sources (both Small and Large businesses) for a complete turnkey UPS replacement. The purpose of this notice is to determine overall market capability and to identify potential Small Business sources (including 8(a), HUBZone, SDVOSB, and WOSB) for acquisition planning
- Status
- Prospective
- Sector
- Energy Storage, Power Generation (CCGT), Residential, Commercial, Car parking, Automotive, Aerospace & Defense, Manufacturing (Industrial)
- Location
- Fargo, North Dakota, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Turnkey Eaton Ups Replacement & Installation
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | sources sought |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The 119th Wing (NDANG) in Fargo, ND is conducting market research under FAR Part 10 and FAR Part 12 to identify capable commercial sources (both Small and Large businesses) for a complete turnkey UPS replacement. The purpose of this notice is to determine overall market capability and to identify potential Small Business sources (including 8(a), HUBZone, SDVOSB, and WOSB) for acquisition planning purposes. This is not a Request for Quote (RFQ) or Request for Proposal (RFP). No reimbursement will be made for any costs associated with providing information. All interested parties are encouraged to respond. The contractor shall provide all equipment, labor, and licensed electrical services to: Deliver and install a new scalable UPS system in Building 542. Complete startup and connected-load testing. Disconnect, remove, and haul away/recycle the existing Eaton 9155 UPS and two external battery cabinets off-site. Brand Name or Equal Equipment: (1 EA) Eaton 9PXM UPS Frame (9PXM08AAXXX) (2 EA) Eaton 4 kVA Split-Phase Power Module (9PXMSPPM) (6 EA) Eaton Battery Pack (9PXMBAT) (1 EA) Eaton 3U Hardwired Bypass Module (BPM125HW) (1 EA) Gigabit Network Card (NETWORK-M3) (1 EA) 3-Yr Onsite 7x24 Next Day Warranty (WFLN73XX-11000UC) (1 JB) Turnkey Delivery, Installation, Startup, and Disposal Key Technical & Site Specs: Power: 208V Single-Phase / Split-Phase (existing 100A breaker is compatible as-is). Footprint: Max 40" L x 24" W (single rack/tower, hot-swappable batteries, min 20 min runtime @ 1.7 kW load). Site Access: Ground-level entrance, parking within 10 ft of door, 2 exterior steps, under 20 ft total carry distance. Please email a reply (email body or attachment) with the following 4 items: Company & Size Info: Company Name, CAGE Code, UEI, POC, and Business Size (Small or Large Business) under NAICS 238210/335999 (including any socioeconomic categories: 8(a), HUBZone, SDVOSB, WOSB). Electrical Capability: Confirm you have licensed electrical support (ND license or reciprocal state) available to perform the on-site work in Fargo, ND. Delivery Lead Time: Estimated equipment lead time in calendar days After Receipt of Order (ARO). Product Offered: Eaton brand or "or equal" (attach standard spec sheet if proposing "or equal" if possible). Response Deadline Due Date: 8 Sep 2026 at 1:00 PM CST Submit via Email To: Rachel Syverson at rachel.syverson@us.af.mil and Brian Erdmann at brian.erdmann@us.af.mil |
Original sector | Not Identified |
Location
Country | United States of America (USA) |
State | North Dakota |
City | Fargo |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Energy Storage, Power Generation (CCGT), Residential, Commercial, Car parking, Automotive, Aerospace & Defense, Manufacturing (Industrial) |
Article published date | 2026-09-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Energy Storage tenders in United States of America
- HOUSEHOLD SINGLEUSE RECHARGEABLE BATTERY COLLECTION AND RECYCLING SERVICES
- BATTERIES FOR SURVEILLANCE EQUIPMENT
- Southeast Water Pollution Control Plant Power Feed and Prima...
- Flashlights and Batteries
- IFB 970302022LW Flashlights and Accessories
- Power Utility Rate Consulting Services for 2021 Electric Rates Study
- RFP - Portable Mass Spectrometer Device
- Southeast Water Pollution Control Plant Power Feed and Prima...
