logo

UK2 - Preliminary Market Engagement Notice RDF

The scope, dates and status of this tender. A free account opens every field.

Source: Open Contracting Data Standard (OCDS)

Tender
Planning

Network Rail's existing fleet of Rail Delivery Trains (RDTs) and Long-Welded Rail Trains (LWRTs) is approaching the point at which replacement options must be considered. Network Rail currently anticipates a future requirement for: • A fleet of approximately 8-11 trains. • A locomotive-hauled solution capable of both rail delivery and rail recovery activities. • A solution capable of carrying a m

Status
Prospective
Sector
Rail
Location
United Kingdom
Updated
3 Nov 2026
Source
Open Contracting Data Standard (OCDS)

ConstructChat

Ask ConstructChat about UK2 - Preliminary Market Engagement Notice RDF

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “UK2 - Preliminary Market Engagement Notice RDF” is a tender record in Taiyo, linked to the Rail sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

planning

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Network Rail's existing fleet of Rail Delivery Trains (RDTs) and Long-Welded Rail Trains (LWRTs) is approaching the point at which replacement options must be considered. Network Rail currently anticipates a future requirement for: • A fleet of approximately 8-11 trains. • A locomotive-hauled solution capable of both rail delivery and rail recovery activities. • A solution capable of carrying a minimum of 24 rails per train. • Remote operation of rail handling equipment to minimise manual intervention and improve operational safety. Engagement undertaken with the market to date has identified several opportunities for consideration as part of the sourcing strategy and technical requirements, including separate procurement of wagons and material handling equipment (MHE), and the development of a modular design making use of intermodal wagons. Network Rail requires market feedback to determine whether these opportunities should be established as requirements within the sourcing activity. Market feedback is therefore sought to help Network Rail understand the implications of adopting these requirements, including: • Impact on market appetite • Impact on design and delivery risks and timescales

Location

Country

United Kingdom (UK)

Source

Source

Open Contracting Data Standard (OCDS)

URL

More Details

Record type

Tender

Sector

Rail

Article published date

2026-08-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender