Ukraine: Supply of containerised gas engine power plants for Lot 1 (approx. 45.6 MW total electrical output power) and Lot 2 (approx. 8.4 MW total electrical output power), including main auxiliary equipment and related services
The scope, dates and status of this tender. A free account opens every field.
Source: European Bank for Reconstruction and Development (EBRD)
Supply of containerised gas engine power plants for Lot 1 (approx. 45.6 MW total electrical output power) and Lot 2 (approx. 8.4 MW total electrical output power), including main auxiliary equipment and related services
- Status
- Prospective
- Sector
- Power Generation (CCGT)
- Location
- Ukraine
- Updated
- 3 Nov 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Ukraine: Supply of containerised gas engine power plants for Lot 1 (approx. 45.6 MW total electrical output power) and Lot 2 (approx. 8.4 MW total electrical output power), including main auxiliary equipment and related services
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | information only |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Supply of containerised gas engine power plants for Lot 1 (approx. 45.6 MW total electrical output power) and Lot 2 (approx. 8.4 MW total electrical output power), including main auxiliary equipment and related services |
Location
Country | Ukraine |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT) |
Article published date | 2026-06-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
