ULSHO : University of Maine at Machias
Bids closed Apr 2026 · Maine · Last reported Apr 2026
Source: Maine Purchasing Group
o All deliveries must comply with Department of Transportation regulations Title 49 of the Code of Federal Regulations . o Deliveries will be made to the storage tanks as listed in the bid specifications , and to locations as may be designated by the participants , in quantities as required during the co
- Status
- Closed
- Sector
- Water Supply and Storage, Education, Commercial, Residential
- Location
- Maine, United States of America
- Updated
- 3 Nov 2026
- Source
- Maine Purchasing Group
ConstructChat
Ask ConstructChat about ULSHO : University of Maine at Machias
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | o All deliveries must comply with Department of Transportation regulations Title 49 of the Code of Federal Regulations . o Deliveries will be made to the storage tanks as listed in the bid specifications , and to locations as may be designated by the participants , in quantities as required during the contract period . o Unless otherwise noted in this document deliveries shall be made by the Contractor in metered residential sized straight tank trucks . 4 . 6 . 1 The Contractor shall be responsible for restarting furnaces and correcting any problems arising from contaminated fuel . For automatic deliveries , and for will - call deliveries for which the Contractor does not respond reasonably timely , the Contractor shall be responsible for restarting furnaces and correcting any problems arising from a tank running out of fuel . In the event that a University employee performs the required work to restart a furnace , reimbursement to the University will be at the Contractor ' s current per hour charge for labor plus the cost of parts . 4 . 6 . 2 On the day of delivery , delivery slips must be left at with a designated representative to be determined upon contract execution . Each delivery shall be accompanied by a pre - numbered and dated metered ticket showing the quantity of fuel delivered . The building name or building number for each delivery address must appear on the delivery ticket and invoice . 4 . 6 . 3 Deliveries will be automatic unless otherwise requested and shall be signed for by the employee responsible for receiving fuel at each location . 4 . 6 . 4 The driver must notify a designated employee that they are on site in order to get the appropriate tools for removing and installing fill pipe covers . 4 . 6 . 5 Deliveries to each University location shall be made between the hours of 7 : 00 a . m . and 3 : 00 p . m . unless otherwise approved by the designated employee of that delivery location . If deliveries are made before or after these hours without the employee ' s approval and if it is necessary to call - back a staff member to assist in locating the appropriate tank / tanks or to open the tank / tanks , the expense for the employee call - back time will be deducted from the invoice . The minimum call - back time is 3 hours . 4 . 6 . 6 The Contractor must be able to provide tanker deliveries on Saturday and / or Sunday as it is difficult to get around in traffic with a tractor - trailer unit . Deliveries will be scheduled at the campus ’ s convenience . 4 . 6 . 7 The Contractor shall ensure that the fill pipe covers are correctly installed following each fuel delivery , in order to prevent water intrusion into the tank . 4 . 7 Spills : All deliveries must comply with the United States Department of Transportation regulations contained in Title 49 of the Code of Federal Regulations . Contractor shall be responsible for complete and immediate clean - up of any spills internal or external , caused by their negligence , equipment , or employees in accordance with all applicable regulations and statutes . The Contractor must notify the University ' s designated employee in writing within twenty - four ( 24 ) hours of any incident whether such spill has resulted in any type of contamination , such as soil or groundwater . " Clean up " means that there will be no remaining trace of contamination . |
Location
Country | United States of America (USA) |
State | Maine |
Source
Source | Maine Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Education, Commercial, Residential |
Article published date | 2026-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
