logo

Underground Facilities Rehabilitation Project

The scope, dates and status of this tender. A free account opens every field.

Source: Wisconsin Purchasing Group

Tender
Closed

. Demolition of high lift pumping and electrical equipment and installation of new electrical equipment in the existing High Lift Pump Station . 2 . Demolition of backwash waste pumping and equipment and installation of new backwash waste pumping and equipment in the existing Backwash Recovery Basin . 3 . Demoli

Status
Closed
Sector
Wind, Chemical (Industrial), Bridge, Water Supply and Storage, Manufacturing (Industrial), Cement, Road
Location
Wisconsin, United States of America
Updated
3 Nov 2026
Source
Wisconsin Purchasing Group

ConstructChat

Ask ConstructChat about Underground Facilities Rehabilitation Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Underground Facilities Rehabilitation Project” is a tender record in Taiyo, linked to the Wind sector. It is issued for works, goods, or services related to Wisconsin, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

. Demolition of high lift pumping and electrical equipment and installation of new electrical equipment in the existing High Lift Pump Station . 2 . Demolition of backwash waste pumping and equipment and installation of new backwash waste pumping and equipment in the existing Backwash Recovery Basin . 3 . Demolition of an existing metering vault . 4 . Construction of a new , multi - level Pump Station including : a . Intermediate , high lift , and backwash vertical turbine pumps , b . Intermediate pump wetwells , c . Ultraviolet ( UV ) room with UV disinfection units and associated piping to new Chlorine Contact ( CT ) Tank , d . Fluoride room with fluoride chemical storage and feed equipment , e . Electrical room with new electrical equipment , including motor control centers and adjustable frequency drives , f . Overhead bridge crane and monorails for equipment handling , g . Surge control tank system , h . Pre - engineered sump pump system , and i . Walkway connecting the new Pump Station to the existing Water Treatment Plant . 5 . Construction of a new , above grade , cast - in - place concrete CT Tank supported on piles . 6 . Modification of an existing 2 . 4kV generator to support 480V service in the existing Water Treatment Plant . 7 . Modification of the existing Water Treatment Plant to connect to the new CT Tank and to disconnect from the existing , below grade CT Tank . 8 . Installation of yard piping connecting the new Pump Station and CT Tank to the existing water system . 9 . Installation of security equipment , systems , and perimeter fencing for the new facilities . 10 . Management of soil excavation , earth retention , shoring and protection of the existing facilities , and sitework for the new stormwater facilities , access road , and landscaping , including contaminated soil which will be managed on site . 11 . Management of sequence of Work to ensure that the existing Water Treatment Plant and all associated services remain online and fully operational throughout the duration of the Project

Location

Country

United States of America (USA)

State

Wisconsin

Source

Source

Wisconsin Purchasing Group

URL

More Details

Record type

Tender

Sector

Wind, Chemical (Industrial), Bridge, Water Supply and Storage, Manufacturing (Industrial), Cement, Road

Article published date

2026-05-06

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender