Uninterruptable Power Supplies ( UPS ) Services - Communications Infrastructure and Support Section ( CISS )
Bids closed Apr 2026 · California · Last reported Apr 2026
Source: California Purchasing Group
A . Contractor agrees to provide maintenance and warranty services as specified herein : i . The Contractor shall provide technical advice and service seven ( 7 ) days per week , twenty - four ( 24 ) hours per day . ii . The Contractor shall provide a toll - free telephone number to reach the Contractor for scheduled
- Status
- Closed
- Sector
- Energy Storage, Power Generation (CCGT), Road
- Location
- California, United States of America
- Updated
- 3 Nov 2026
- Source
- California Purchasing Group
ConstructChat
Ask ConstructChat about Uninterruptable Power Supplies ( UPS ) Services - Communications Infrastructure and Support Section ( CISS )
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | A . Contractor agrees to provide maintenance and warranty services as specified herein : i . The Contractor shall provide technical advice and service seven ( 7 ) days per week , twenty - four ( 24 ) hours per day . ii . The Contractor shall provide a toll - free telephone number to reach the Contractor for scheduled and unscheduled services . iii . Telephone response of two ( 2 ) hours is required and on - site response time of eight ( 8 ) hours or less . iv . On - site unscheduled maintenance response time of either ( 8 ) hours or less . B . Scheduled maintenance shall be performed on , but not limited to , the UPS system and all components inclusive of rectifiers , inverters , power supplies , switches , fans , filters , module and module cabinets , converters , chargers , static transfer switches , internal bypass lines , control batteries and internal control systems , external batteries , etc . C . Maintenance shall consist of , but not be limited to , the battery voltage and current readings , making adjustments as necessary , checking connections for corrosion and torque , and checking remote alarm / status system operation , in accordance with the UPS maintenance manual and adherence to manufacturer specifications . D . Contractor shall maintain battery plant records and make them available on site for customer inspections . E . Contractor shall provide a completed and signed Field Service Report ( Attachment 4 ) to CISS after each visit . Field service reports must contain , as a minimum , the information contained on the Sample Field Service Report , Attachment 2 . |
Location
Country | United States of America (USA) |
State | California |
Source
Source | California Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Energy Storage, Power Generation (CCGT), Road |
Article published date | 2026-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Energy Storage tenders in United States of America
- HOUSEHOLD SINGLEUSE RECHARGEABLE BATTERY COLLECTION AND RECYCLING SERVICES
- BATTERIES FOR SURVEILLANCE EQUIPMENT
- Southeast Water Pollution Control Plant Power Feed and Prima...
- Flashlights and Batteries
- IFB 970302022LW Flashlights and Accessories
- Power Utility Rate Consulting Services for 2021 Electric Rates Study
- RFP - Portable Mass Spectrometer Device
- Southeast Water Pollution Control Plant Power Feed and Prima...
