logo

Unit Price Contract For Maintenance Dredging Of Pensacola Harbor Entrance Channel

The scope, dates and status of this tender. A free account opens every field.

Source: SAMGOVCO

Tender
Solicitation

The requirement will be for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 39 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type ex

Status
Prospective
Sector
Residential, Commercial, Seaport, Aerospace & Defense
Location
United States of America
Updated
3 Nov 2026
Source
SAMGOVCO

ConstructChat

Ask ConstructChat about Unit Price Contract For Maintenance Dredging Of Pensacola Harbor Entrance Channel

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Unit Price Contract For Maintenance Dredging Of Pensacola Harbor Entrance Channel” is a tender record in Taiyo, linked to the Residential sector. It is issued for works, goods, or services related to Pensacola Harbor Entrance Channel, Pensacola, Florida.

Participants

Not available for this record.

Status

Original status

solicitation

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The requirement will be for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 39 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type expected for this requirement will be maintenance material typical for Pensacola Entrance Channel composed of sand. Material dredged will be placed west of the Pensacola Entrance Channel along Perdido Key Beach. The maximum pumping distance for beach placement will be approximately 30,000-feet. Amendment 0001 is posted 29 September 2026. Amendment 0002 is posted 05 October 2026.

Original sector

Construction

Location

Country

United States of America (USA)

Source

Source

SAMGOVCO

URL

More Details

Record type

Tender

Sector

Residential, Commercial, Seaport, Aerospace & Defense

Article published date

2026-10-06

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender