UNMH Construction Manager at Risk ( CMAR ) - Lomas Bridge Revitalization Project
The scope, dates and status of this tender. A free account opens every field.
Source: New Mexico Purchasing Group
Revitalization project occurring to take the existing Lomas Bridge down to structure to support remediation and rebuild with a design that reflects that it ’ s prominence of arrival at the University of New Mexico , and serve as a connection between staff parking structure and the UNM Hospital . UNMH and
- Status
- Closed
- Sector
- Bridge, Education, Car parking, Commercial, Automotive, Hospital
- Location
- New Mexico, United States of America
- Updated
- 3 Nov 2026
- Source
- New Mexico Purchasing Group
ConstructChat
Ask ConstructChat about UNMH Construction Manager at Risk ( CMAR ) - Lomas Bridge Revitalization Project
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Revitalization project occurring to take the existing Lomas Bridge down to structure to support remediation and rebuild with a design that reflects that it ’ s prominence of arrival at the University of New Mexico , and serve as a connection between staff parking structure and the UNM Hospital . UNMH and UNM will request ( 3 ) bridge design options along with ( 2 ) alteration options as well after determination is made from original ( 3 ) options submitted and ( 3 ) materials options that incorporate the Pueblo Revival theme from the design team . The design team will also Include 3D renderings of the bridge option selected with flythrough / animation for review from stake holders . This project will require at a minimum structural , building envelope , plumbing / drainage , signage , electrical and access control portions to meet the intent of revitalize the bridge for its intended purpose while meeting all codes adopted by our Authorities Having Jurisdiction ( AHJ ) including ADA . UNMH is requesting the design options include a canopy , providing a covered ( non - conditioned ) walk path from the garage to the Ambulatory Care Center , and include video message boards with maintenance platform to promote marketing initiatives . The awarded CMAR Contractor is responsible for collaborating with the design team in design reviews , comments and constructability of the overall design , cost estimation , and all construction efforts and services to support Construction Manager at Risk ( CMAR ) delivery method with early work packages to promote efficient select demolition to promote build back for a fully function project for its intended purpose . |
Location
Country | United States of America (USA) |
State | New Mexico |
Source
Source | New Mexico Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Bridge, Education, Car parking, Commercial, Automotive, Hospital |
Article published date | 2026-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Bridge tenders in United States of America
- FY2023 Patch Truck
- 20222023 Bridge Preventive Maintenance Program
- Small Bridge Design Services Various Locations throughout Ocean County
- Pipeline Trail Phase 1 Project
- Construction Engineering Inspection Services for FDOT LAP Bridge Projects
- Miccosukee Road Bridge Replacement
- Bridge Design Services 3 Bridges on CTH BB CTH N and CTH TT
- Emergency Repairs to HHW & Power Facilities Following the Ma...
