UNR - Construct Drainage Diversion at West Side Exterior Stairway of University Foundation Arts Building
The scope, dates and status of this tender. A free account opens every field.
Source: Nevada
BCN Purchasing does not accept physical documents in response to any solicitation including but not limited to: ITB, RFP, RFQ, or CMAR solicitations. All documents must be submitted electronically via this website.The NGEM system allows for bidders to start and save work/uploads without submitting. Please make use of this capability to begin building your bid early and reduce the chances of intern
- Status
- Bidding
- Sector
- Education, Broadband, Automotive, Telecommunications, Commercial
- Location
- Nevada, United States of America
- Updated
- 3 Nov 2026
- Source
- Nevada
ConstructChat
Ask ConstructChat about UNR - Construct Drainage Diversion at West Side Exterior Stairway of University Foundation Arts Building
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | issued |
Taiyo status | Bidding |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | BCN Purchasing does not accept physical documents in response to any solicitation including but not limited to: ITB, RFP, RFQ, or CMAR solicitations. All documents must be submitted electronically via this website.The NGEM system allows for bidders to start and save work/uploads without submitting. Please make use of this capability to begin building your bid early and reduce the chances of internet connectivity or upload issues causing a last-minute inability to submit.Once the ITB/RFP/RFQ/CMAR closes and the responses are unsealed electronically, the list of bidders/responders will be posted online shortly thereafter and available to the public for viewing. This document can be accessed by clicking on Closed Bid Opportunities, selecting the specific opportunity, and scrolling down to Bid Documents. The Bid Tabulation document will be available for review there.Description of Work:This is a prevailing wage project.Construct Drainage Diversion at West Side Exterior Stairway of University Foundation Arts BuildingUNR Project#: #26MNC03652Labor Commissioner #: WA-2027-011SPWD Project #:26-B906Estimated Cost Range: $50,500 to $150,500Liquidated Damages: $500 per dayRequired Insurance if Awarded:Commercial General Liability, Business Automobile Liability, Workers' Compensation, Pollution Liability, and Builders Risk will be required. Riggers Liability will be required if a crane is used. Please refer to the TEMPLATE-Owner-Contractor Construction Agreement on the Attachments tab for limits and additional information and in compliance with the requirements set forth here: https://www.unr.edu/bcn-nshe/risk/contracts.Special Considerations:Use of equipment such as a forklift, scissor lift, or crane may be required.Completion of Work: Subject to change by Owner, Work is scheduled to begin on "October 26, 2026" and shall be fully complete by "April 30, 2027." |
Location
Country | United States of America (USA) |
State | Nevada |
Source
Source | Nevada |
URL |
More Details
Record type | Tender |
Sector | Education, Broadband, Automotive, Telecommunications, Commercial |
Article published date | 2026-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
