Upgrade Generator Control System
Sector: Power Generation (CCGT) • Location: Vienna, AT-9, Austria
Source: SAM.gov
The upgrade of the generator control system consists of, but is not limited to the following: Execution planning Decommissioning, Removal and disposal of existing generator control system Disconnection, removal and disposal of existing ACON Generator control system Delivery, installation and commissioning of new generator control system Delivery (HW & SW), installation and connection of new DSE 86
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Residential, Manufacturing (Industrial)
- Location
- Vienna, AT-9, Austria
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Upgrade Generator Control System
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The upgrade of the generator control system consists of, but is not limited to the following: Execution planning Decommissioning, Removal and disposal of existing generator control system Disconnection, removal and disposal of existing ACON Generator control system Delivery, installation and commissioning of new generator control system Delivery (HW & SW), installation and connection of new DSE 8620MKII (or equal) control system The Contractor guarantees spare parts availability (software and hardware components) for a minimum of 10 years. Commissioning, test run Customer training/documentation Under the contract the contractor assumes full and unlimited responsibility for the right choice and correct workmanship of flawless material as well as for proper and professional completion. Regulations/standards incl. electro- technical safety regulations: ÖNORM B 2110 General terms for construction work ETG 1992 electrical engineering law ÖVE/ÖNORM- E 8101 ÖVE/ÖNORM- E 8015-1-3 ÖVE/EN 1 DIN German industrial standards VDI guidelines Upgrade MTU 500kVA- Generator Control system- work must be scheduled for a weekend between Fr, 5pm until Su, 7pm. Generator downtime must be always kept to a minimum. Planned Execution period: Ocotober 2026 |
Original sector | Utilities |
Location
Country | Austria |
State | AT-9 |
City | Vienna |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT), Commercial, Residential, Manufacturing (Industrial) |
Article published date | 2026-07-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Generation (CCGT) tenders in Austria
- Rahmenvereinbarung Strom und Spannungswandler für 0,4kV, 10 u, 30kV
- Netzberechnung und Netzanalyse/Anschlussbeurteilung für Erzeugungs- und Verbrauchsanlagen
- Modernisierung Betriebshof Alpenstraße - Seitensektionaltore (Los 1)
- UW-Mauthausen Los 1: GU-Baumeisterarbeiten
- Baumeisterarbeiten - 2. Obergeschoss Bayerhamerstraße 16
- AN 110kV Hospannungsklemmen Rahmen
- Beschaffung eines hybriden Enterprise CMS
- (ProVia-ID 149096) Werndorf - Lebring; zweigleisiger Ausbau; Planung; Untergrunderkundungen und Errichtung Zufahrtsstraße
