Upgrade Ups & Cooling System
Sector: Energy Storage • Location: Cheyenne, Wyoming, United States of America
Source: SAM.gov
The vendor shall provide un-installation of outdated equipment and installation of brand-new items according to acceptable standards. Contractor shall provide Uninterruptible Power and Cooling Distribution Unit replacement/ installation and a Site Lead/Project Manager to provide the following critical tasks to support to the WYANG per the PWS. • 5.3.3 Capture existing cooling fluid/Re-fill system
- Status
- Prospective
- Sector
- Energy Storage, Power Generation (CCGT), Aerospace & Defense, Data Center, Commercial, Residential, Manufacturing (Industrial)
- Location
- Cheyenne, Wyoming, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Upgrade Ups & Cooling System
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | combined synopsis/solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The vendor shall provide un-installation of outdated equipment and installation of brand-new items according to acceptable standards. Contractor shall provide Uninterruptible Power and Cooling Distribution Unit replacement/ installation and a Site Lead/Project Manager to provide the following critical tasks to support to the WYANG per the PWS. • 5.3.3 Capture existing cooling fluid/Re-fill system with cooling fluid. • 5.3.4 Demo existing piping • 5.3.5 Run new Pex piping to the in-row coolers. • 5.3.6 Furnish & install new 350A shut Trip Breaker with nema-1 Enclosure. Tie existing EPO into new Shunt Trip breaker. • 5.3.7 Existing 3” Feeder conduit & wire fed from MDP will be shutdown & locked out. Intercept existing Feeder to line side of new 350A Shunt Trip Breaker/Enclosure. Install Load side Feeder conduit & wire from new Shunt Trip Breaker to new UPS. • 5.3.8 Demo existing UPS, remove from Data Center, Dispose/recycle old UPS. • 5.3.9 Install Power Modules and Battery Cabinets • 5.3.10 Assume the existing structural integrity of raised floor is sufficient to move old UPS across floor & new UPS installed at old UPS location. All raised floor modifications by others. SITE VISIT: 10 JUNE 2026 AT 1300 MDT at 217 Dell Range Blvd, Cheyenne, WY 82009 - IF NO REQUEST FOR SITE VISIT ARE RECIEVED BY 08 JUNE 2026 AT 1200 MDT, IT WILL BE CANCELED. QUESTIONS DUE: 12 JUNE 2026 AT 1000 MDT |
Original sector | Not Identified |
Location
Country | United States of America (USA) |
State | Wyoming |
City | Cheyenne |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Energy Storage, Power Generation (CCGT), Aerospace & Defense, Data Center, Commercial, Residential, Manufacturing (Industrial) |
Article published date | 2026-06-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Energy Storage tenders in United States of America
- HOUSEHOLD SINGLEUSE RECHARGEABLE BATTERY COLLECTION AND RECYCLING SERVICES
- BATTERIES FOR SURVEILLANCE EQUIPMENT
- Southeast Water Pollution Control Plant Power Feed and Prima...
- Flashlights and Batteries
- IFB 970302022LW Flashlights and Accessories
- Power Utility Rate Consulting Services for 2021 Electric Rates Study
- RFP - Portable Mass Spectrometer Device
- Southeast Water Pollution Control Plant Power Feed and Prima...