This contract is comprised of installing utility lines, connections to existing lines and connections to trailer pads. Utilities included are electrical, water and sewer. Option items included are trenching, providing and spreading gravel and installation of an asphalt apron. Water and Sewer lines and connections must be kept 10ft apart. Contractor must work with and is responsible for all communi

Status
Prospective
Sector
Raw Materials, Commercial, Waste Processing and Treatment, Residential, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Road
Location
Monticello, Utah, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Upper Baker Installing Trailer Pads And Utilities

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Upper Baker Installing Trailer Pads And Utilities” is a tender record in Taiyo, linked to the Raw Materials sector. It is issued for works, goods, or services related to Monticello, Utah, United States of America.

Participants

Not available for this record.

Status

Original status

combined synopsis/solicitation

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

This contract is comprised of installing utility lines, connections to existing lines and connections to trailer pads. Utilities included are electrical, water and sewer. Option items included are trenching, providing and spreading gravel and installation of an asphalt apron. Water and Sewer lines and connections must be kept 10ft apart. Contractor must work with and is responsible for all communications, supplies and permits with utility companies associated. All utilities will be installed in compliance with State and/or San Juan County code. Utilities – Water - The new water line will be connected to the existing water line between the meter and bunkhouse. Main water line will remain same size as existing line. Existing line is a 2” poly line. New water line will be a 2” HDPE blue Poly and connect to existing. One stop and waste to be installed within 5ft of new and existing line connection. Sewer – The new sewer line will be connected to the existing sewer line at the bunkhouse. Main line will be 6” with trailer connections being 6” to 3” Wye’s. Drainage must remain between 1/8” – ¼” per ft across the entirety of the line. Must meet state code. Electrical – A transformer and drop-down meter will need to be coordinated and installed with Empire Electric and conduit and wiring ran from meter to the trailer pads. Contractor will be responsible for determining sizing of conduit and wiring. Must meet state code. Option Items – Trenching and Backfilling – Trenching will need to be 36” deep to meet frost line requirements. Crushed Aggregate – Grade G Road Base for the trailer pads and roadway

Original sector

Construction

Location

Country

United States of America (USA)

State

Utah

City

Monticello

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Raw Materials, Commercial, Waste Processing and Treatment, Residential, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Road

Article published date

2026-07-08

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender