Upper Baker Installing Trailer Pads And Utilities
Sector: Raw Materials • Location: Monticello, Utah, United States of America
Source: SAM.gov
This contract is comprised of installing utility lines, connections to existing lines and connections to trailer pads. Utilities included are electrical, water and sewer. Option items included are trenching, providing and spreading gravel and installation of an asphalt apron. Water and Sewer lines and connections must be kept 10ft apart. Contractor must work with and is responsible for all communi
- Status
- Prospective
- Sector
- Raw Materials, Commercial, Waste Processing and Treatment, Residential, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Road
- Location
- Monticello, Utah, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Upper Baker Installing Trailer Pads And Utilities
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | combined synopsis/solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This contract is comprised of installing utility lines, connections to existing lines and connections to trailer pads. Utilities included are electrical, water and sewer. Option items included are trenching, providing and spreading gravel and installation of an asphalt apron. Water and Sewer lines and connections must be kept 10ft apart. Contractor must work with and is responsible for all communications, supplies and permits with utility companies associated. All utilities will be installed in compliance with State and/or San Juan County code. Utilities – Water - The new water line will be connected to the existing water line between the meter and bunkhouse. Main water line will remain same size as existing line. Existing line is a 2” poly line. New water line will be a 2” HDPE blue Poly and connect to existing. One stop and waste to be installed within 5ft of new and existing line connection. Sewer – The new sewer line will be connected to the existing sewer line at the bunkhouse. Main line will be 6” with trailer connections being 6” to 3” Wye’s. Drainage must remain between 1/8” – ¼” per ft across the entirety of the line. Must meet state code. Electrical – A transformer and drop-down meter will need to be coordinated and installed with Empire Electric and conduit and wiring ran from meter to the trailer pads. Contractor will be responsible for determining sizing of conduit and wiring. Must meet state code. Option Items – Trenching and Backfilling – Trenching will need to be 36” deep to meet frost line requirements. Crushed Aggregate – Grade G Road Base for the trailer pads and roadway |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | Utah |
City | Monticello |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Raw Materials, Commercial, Waste Processing and Treatment, Residential, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Road |
Article published date | 2026-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Raw Materials tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Hay Cutting and Removal for Jordan Farm and Coleman Farm
- Antiscalant Chemical
- As-Needed Sewer Inspection (FY23) [BID TABULATION]
- Landscaping (C-27 License), San Francisco, San Mateo, Santa ...
- Van Ness Avenue Auxiliary Water Supply System Upgredes
- Sunol Valley Water Treatment Plant Ozonation
- Oceanside Water Pollution Control Plant Digester Gas Utiliza...
