Upper Elementary School Door & Hardware Replacement
One of 3,321 tenders Taiyo tracks in MITN.
Source: MITN Purchasing Group
The following sections provide steps , procedures , and details that all vendors should adhere to when designing solution for Clinton Community Schools . The schedule of doors can be found in Appendix E . We are seeking qualified responder ( s ) to supply the following Goods and / or Services . This equipment must
- Status
- Closed
- Sector
- Metal, Steel, Manufacturing (Industrial), Commercial, Cement
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about Upper Elementary School Door & Hardware Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The following sections provide steps , procedures , and details that all vendors should adhere to when designing solution for Clinton Community Schools . The schedule of doors can be found in Appendix E . We are seeking qualified responder ( s ) to supply the following Goods and / or Services . This equipment must comply with the following MINIMUM specifications : Door : • Hollow Metal Frames o Coordinate anchorage installation for hollow - metal frames . Furnish setting drawings , templates , and directions for installing anchorages , including sleeves , concrete inserts , anchor bolts , and items with integral anchors . Deliver such items to Project site in time for installation . o Coordinate requirements for installation of door hardware , electrified door hardware , and access control and security systems o Construct hollow - metal frames to comply with standards indicated for materials , fabrication , hardware locations , hardware reinforcement , tolerances , and clearances , and as specified . o Frames : ▪ Materials : Uncoated steel sheet , minimum thickness 16 gauge . ▪ Sidelite Frames : Fabricated from same thickness material as adjacent door frame . ▪ Construction : Full profile welded . ▪ Exposed Finish : Prime o Frame Anchors ▪ Anchors of minimum size and type required by applicable door and frame standard , and suitable for performance level indicated . ▪ Quantity : Minimum of three anchors per jamb , with one additional anchor for frames with no floor anchor . Provide one additional anchor for each 24 inches of frame height above 7 feet . o Doors ( Interior ): ▪ Five - ply flush wood veneer - faced doors for transparent finish . ▪ Factory finishing flush wood doors ▪ Factory fitting flush wood doors to frames and factory machine for hardware ▪ Obtain flush wood doors from single manufacturer ▪ Faces • Species : Select white maple . • Cut : Plain sliced ( flat sliced ). • Match between Veneer Leaves : Book match . • Assembly of Veneer Leaves on Door Faces : Center - balance match . • Pair and Set Match : Provide for doors hung in same opening . • Room Match : Match door faces within each separate room or area of building . • Corridor - door faces do not need to match where they are separated by 20 feet or more . • Room Match : Provide door faces of compatible color and grain within each separate room or area of building . • Exposed Vertical Edges : Same species as faces or a compatible species ... |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Metal, Steel, Manufacturing (Industrial), Commercial, Cement |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Metal tenders in United States of America
- Token Creek Roof Replacements
- HVAC Ice Machine Servicing and Sheet Metal Fabrication
- Jail Courthouse Walkway Project
- RFP 887702021MF Rapid Response Fire Boat for Norfolk FireRescue
- Various Locations Sewer Replacement No. 9 [BID TABULATION]
- Millbrae Warehouse Loading Dock Repair
- Biosolids Digester Facilities - Southeast Treatment Plant T-...
- Electrical (C-10 License), San Francisco, San Mateo, Santa C...
