logo

Ups Battery Backup

Sector: Power Generation (CCGT) • Location: Fort Collins, Colorado, United States of America

Source: SAM.gov

Tender
Solicitation

Work includes adding a UPS system to a server. Installation includes a 25kW UPS unit on one of the current 60-amp circuits for the main server rack. Equipment includes a Galaxy VS UPS 25kW 208V, 2 internal 9Ah smart modular battery strings, expandable to 4, Start-up 5x8, or equal, and Galaxy VS Maintenance Bypass cabinet, UL, Single-unit 10-40kW 208V, 20-80kW 480V, or equal. Also required is an Em

Status
Closed
Sector
Power Generation (CCGT), Energy Storage, Raw Materials, Commercial, Residential
Location
Fort Collins, Colorado, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Ups Battery Backup

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Ups Battery Backup” is a tender record in Taiyo, linked to the Power Generation (CCGT) sector. It is issued for works, goods, or services related to Fort Collins, Colorado, United States of America.

Participants

Not available for this record.

Status

Original status

solicitation

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Work includes adding a UPS system to a server. Installation includes a 25kW UPS unit on one of the current 60-amp circuits for the main server rack. Equipment includes a Galaxy VS UPS 25kW 208V, 2 internal 9Ah smart modular battery strings, expandable to 4, Start-up 5x8, or equal, and Galaxy VS Maintenance Bypass cabinet, UL, Single-unit 10-40kW 208V, 20-80kW 480V, or equal. Also required is an Emergency Power Off button. Solicitation and attachment are posted below. Photos of room and equipment posted below. RFI: Would you be able to tell me what the battery runtime requirement is for this opportunity? Response: Less than 5 min, main purpose is to run between power outage and when the generator will kick on, which should be less than 30 secs. An amendment to postpone the closing date for quotes and RFIs and responses are posed below.

Original sector

Construction

Location

Country

United States of America (USA)

State

Colorado

City

Fort Collins

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Power Generation (CCGT), Energy Storage, Raw Materials, Commercial, Residential

Article published date

2026-03-07

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender