Scope of Service  Provide and install two new UPS units meeting the following specifications ; Eaton 9 PXM Series 20 KVA , Scalable single phase online rack / tower UPS , Preconfigured system , 20k VA / 18kw 120 / 208 / 240V 50 / 60HZ consisting of one 12 slot cabinet , five 4kva / 3 . 6 kw power modules , fourteen

Status
Closed
Sector
Energy Storage, Power Generation (CCGT), Manufacturing (Industrial)
Location
Wisconsin, United States of America
Updated
3 Nov 2026
Source
Wisconsin Purchasing Group

ConstructChat

Ask ConstructChat about UPS Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “UPS Replacement” is a tender record in Taiyo, linked to the Energy Storage sector. It is issued for works, goods, or services related to Wisconsin, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Scope of Service  Provide and install two new UPS units meeting the following specifications ; Eaton 9 PXM Series 20 KVA , Scalable single phase online rack / tower UPS , Preconfigured system , 20k VA / 18kw 120 / 208 / 240V 50 / 60HZ consisting of one 12 slot cabinet , five 4kva / 3 . 6 kw power modules , fourteen battery modules ( 7 string ) and one Network - M2 web / SNMP card . One of the units shall be installed at the Deerview tower and one unit at the Seymour tower .  Provide and install two Eaton wall mounted bypass switches , one for each UPS unit . Bypass switches shall be Eaton BPM125HW wall mounted bypass switches and shall be mounted in the location of the old Liebert bypass switches .  Provide and install Eaton Management Card Contact RS232 / Serial Relay card and ancillary connector on each UPS unit . Connect external alarm connections that were removed from the old UPS units to the new UPS units . Verify new UPS units send alarms to the County alarm system through the relay cards .  Contractor shall perform all electrical work including disconnecting the old units and re - wiring in new switches and UPS units including power connections and moving any alarm monitoring wiring from the old UPS units to the new units . Contractor shall also be responsible for extending wiring and conduits as needed to accommodate new switches and UPS units .  The tower UPS units provide power to critical Sheriff ’ s communication equipment . The contractor shall assure all parts are onsite prior to starting work and must plan work in a manner that minimizes down time as much as possible . The new UPS units must be in operation on the same day the old units are taken out of service .  Contractor shall perform start up and test all units for proper functionality directly after the change out so the units can be put into service the same day .  Outagamie County shall have first rights to any of the old equipment such as the interface , power modules and batteries which could be used as backup parts for other county UPS units . Contractor shall be responsible for removing and site clearing all other old UPS and Switch components relating to the change out .  All delivery and removal charges shall be included in the bid price . Towers are located at remote sites that are unmanned and do not have delivery docks . There is also minimal storage space within the tower buildings so equipment should be delivered near the install date .  Contractor shall provide the County with a minimum of a 3 weeks ’ notice before replacing the equipment so the County can plan for the work .  Contractors work shall follow all local jurisdictional codes . Contractor is also reasonable for any required permits including the cost of any permits .  All UPS units and ancillary parts must be in new factory sealed condition . No open box , refurbished or used equipment will be accepted . Substitute or alternate brands or models of equipment will not be considered or accepted .  Provide one - year parts and labor warranty on all equipment . Contractors shall price each tower separately and each tower will be separately .

Location

Country

United States of America (USA)

State

Wisconsin

Source

Source

Wisconsin Purchasing Group

URL

More Details

Record type

Tender

Sector

Energy Storage, Power Generation (CCGT), Manufacturing (Industrial)

Article published date

2026-05-06

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender