Uscg Cutter Eagle New Dredging For Berthing At New London City Pier
Presolicitation · Connecticut
Source: SAM.gov
Solicitation packages will be available on or about 08/11/2026. The Contractor shall provide all labor, materials, equipment, supervision, and disposal required for USCG Cutter Eagle Berth - New Dredging at New London’s City Pier. The project intent is to deepen the berthing area to allow tug boats to assist the cutter for mooring/unmooring at all tide levels, dredging to a depth of -17.0’ at Mean
- Status
- Prospective
- Sector
- Residential, Commercial, Water Supply and Storage, Government
- Location
- New London, Connecticut, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Uscg Cutter Eagle New Dredging For Berthing At New London City Pier
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | presolicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Solicitation packages will be available on or about 08/11/2026. The Contractor shall provide all labor, materials, equipment, supervision, and disposal required for USCG Cutter Eagle Berth - New Dredging at New London’s City Pier. The project intent is to deepen the berthing area to allow tug boats to assist the cutter for mooring/unmooring at all tide levels, dredging to a depth of -17.0’ at Mean Lower Low Water (MLLW). This invitation for bid is issued pursuant to FAR Part 14 and is 100% set-aside for Small Business concerns in accordance with FAR Part 19.5. The applicable North American Industry Classification System (NAICS) code is 237990 Other Heavy and Civil Engineering Construction with a small business size standard of $37.0 million. The magnitude of construction range of this project is between $1,000,000 and $5,000,000. Bid, payment, and performance bonds will be required. The overall performance period for this project is 300 Calendar Days from issuance of a Notice to Proceed (NTP). The bid opening date is scheduled for 09/10/2026 at 2:00 pm. All relevant solicitation documents, including specifications and drawings may be accessed for download beginning on the date of issue at the following site: https://sam.gov/content/opportunities. To receive immediate notification of all changes posted electronically, vendors should click on [Register to Receive Notification]. All vendors interested in teaming or subcontracting for this solicitation, should click on [Register as Interested Vendor]. To view a list of interested vendors, interested parties should click on [View List of Interested Vendors]. A list of interested vendors is only available by registering electronically for this solicitation. Vendors MUST be registered in the System for Award Management database to receive a federal government contract. |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | Connecticut |
City | New London |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Residential, Commercial, Water Supply and Storage, Government |
Article published date | 2026-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
