USCG KETCHIKAN ELECTRICAL WORK
Sector: Power Generation (CCGT) • Location: Alaska, United States of America
Source: Alaska Purchasing Group
EXTENDED PROPOSAL DUE DATE OUT TO 13 MARCH 2026 AT 3 : 00 PM ALASKA TIMESEE ATTACHED SPECS / SCOPE OF WORK ---- Scope of Work : Electrical Inspection and Maintenance – Floating Pier One , Base Ketchikan1 . Objective : Provide inspection , maintenance , and repair services for electrical systems associated with Floating Pi
- Status
- Closed
- Sector
- Power Generation (CCGT)
- Location
- Alaska, United States of America
- Updated
- 3 Nov 2026
- Source
- Alaska Purchasing Group
ConstructChat
Ask ConstructChat about USCG KETCHIKAN ELECTRICAL WORK
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | EXTENDED PROPOSAL DUE DATE OUT TO 13 MARCH 2026 AT 3 : 00 PM ALASKA TIMESEE ATTACHED SPECS / SCOPE OF WORK ---- Scope of Work : Electrical Inspection and Maintenance – Floating Pier One , Base Ketchikan1 . Objective : Provide inspection , maintenance , and repair services for electrical systems associated with Floating Pier One , Base Ketchikan , with a focus on shore tie terminals and associated electrical lines . 2 . Location : Floating Pier One , Base Ketchikan . Berth 53 . Tasks : A . Shore Tie Terminal MaintenanceInspect all shore tie terminals where vessels connect to shore power . Identify and document any damage , corrosion , moisture intrusion , or other deficiencies . Repair any identified issues to restore full functionality . Dry and seal all shore tie terminals to prevent future moisture intrusion . Test terminals for proper operation after repairs and sealing . B . Electrical Line Inspection and GroomingInspect the electrical line running from the FRC Floating Pier Isolation Transfer to the shore tie terminals . Clean and groom all accessible portions of the line , removing debris , corrosion , and contaminants . Conduct a thorough inspection for physical damage , wear , or potential failure points . Perform Megger ( insulation resistance ) testing on the electrical lines to identify any insulation breakdowns or other potential issues . Document all findings and provide recommendations for further action if required . 4 . Deliverables : Written inspection report detailing findings , repairs performed , and recommendations for future maintenance . Documentation of Megger test results and any corrective actions taken . Photographic evidence of before and after conditions for all work performed . 5 . Period of Performance : Shore Tie Terminal inspection and maintenance shall be completed withintwo ( 2 ) weeksfrom award of contract . Electrical line inspection , grooming , and cleaning shall be completed withinthree ( 3 ) weeksfrom award of contract . Final written report of findings and actions written ( typed ) and documented shall be submitted withinone ( 1 ) monthfrom the start of the period of performance . 6 . Safety and Compliance : All work must comply with applicable electrical codes , safety standards , and Base Ketchikan requirements . All personnel must be appropriately licensed and qualified for marine electrical work . Quote / Estimate : Quote or Estimate shall include materials going up to 5 , 000K for any repairs in the shore tie terminal box on the floating pier , but not to exceed . Question : Could you quantify the shore tie terminals and cable lengths from Isolation Transfer to each Terminal to refine labor / testing time . answer to a contractors question 1 . Good Afternoon Contracting Team , The Shore tie Terminals is one box that has two plugs for shore ties . Approximate size is 4 ’ x4 ’ x2 ’ Not exact size of the box , but approximate . Approximate distance of the cable / conduit run is 550 ’ plus or mins 20 feet . Area of Concern : On map , it is South Float One ( Berth 5 and Berth 10 ). Base Ketchikan POC : LT Robert Marx and CWO Russell Dever .*** contact Senior Field Contracting Officer ( SFCO ) DENO STAMOS AT deno . a . stamos @ uscg . mil if a site walk is required . THIS IS A COMBINED SYNOPSIS SOLICIATION . RECEIPT OF BIDS VIA EMAIL IS DUE NO LATER THAN 26 FEBRUARY 2026 AT 3 : 00 PM ALASKA TIME ZONE , NAICS CODE : 238210FSC CODE : J059 |
Location
Country | United States of America (USA) |
State | Alaska |
Source
Source | Alaska Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT) |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Generation (CCGT) tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Security Hardware Services
- 23B49SR Marine Science Center Turtle Canopy
- Purchase and Supply of Engine Oil for the McIntosh Reciprocating Engine Project MREP
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- PreQualification of Bidders for Chaboya Improvements
