USCG PATOKA MOLD REMEDIATION AND RE - INSULATION
Closed · Mississippi · Last reported Jan 2026
Source: Mississippi Purchasing Group
This RFQ had been extented to close on 02 / 05 / 2026 to give an opportunitty to all vendors to do cite visit for this requirenment . Please feel free to contact the below POC if requesting any cite visit : michael . d . zimmer2 @ uscg . milMKC Michael ZimmerWLR / WLM Asset MangerUSCG Surface Forces Logistics Cent
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Seaport, Government, Geothermal, Metal, Power Generation (CCGT), Warehouse, Steel, Commercial, Residential
- Location
- Mississippi, United States of America
- Updated
- 3 Nov 2026
- Source
- Mississippi Purchasing Group
ConstructChat
Ask ConstructChat about USCG PATOKA MOLD REMEDIATION AND RE - INSULATION
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This RFQ had been extented to close on 02 / 05 / 2026 to give an opportunitty to all vendors to do cite visit for this requirenment . Please feel free to contact the below POC if requesting any cite visit : michael . d . zimmer2 @ uscg . milMKC Michael ZimmerWLR / WLM Asset MangerUSCG Surface Forces Logistics Center2401 Hawkins Point RDBaltimore , MD . 21226This is a combined synopsis / solicitationThis is a combined synopsis / solicitation for commercial items / services prepared in accordance with the format in FAR Subpart 12 . 6 as supplemented with additional information included in this notice . Request for Quotations number is70Z08526Q0001423and is issued as a request for quotations ( RFQ ). This announcement constitutes only solicitation ; quotations are being requested , and a written solicitation will not be issued . This Request for Quotations incorporates provisions and clauses in effect through Federal Acquisition Circular 2005 - 65 dated January 29 , 2013 . The NAICS Code is 336611 . The small business size standard is 1250 . This is a totally small business set aside . All responsible sources may submit proposals that will be considered by the agency . The contract will be awarded on a firm - fixed - price basis using simplified acquisition procedures in accordance with FAR Part 13 . 5 . All responses from interested vendors must be received on / before 0800 Pacific Time , January 27th , 2026 , and will be reviewed by the Government . The United States Coast Guard Surface Force Logistics Center has a requirement for the following : Contractor shall provide parts requested for USCGC PATOKA Mold Remediation Spare Parts : STATEMENT OF WORK ( SOW ) FORUSCGC PATOKA MOLD REMEDIATION AND REINSULATIONPATOKA discovered mold in their berthing and common areas and has an immediate need for technical support for tasks outlined in this Statement of Work ( SOW ). 1 . 0 GENERALBackgroundThe 75 ’ WLR asset , USCGC PATOKA , had a previous mold remediation completed were contractors removed and replaced approximately 1510 square feet of overhead and bulkhead insulation and panels . However , the contractor did not fill all the air gaps between the false bulkhead and the bulkhead , leaving room for air to condensate on the panels . The contractor also installed the incorrect panels , using a type of steel instead of aluminum , this steel paneling has begun to rust as moisture condenses on the panels . ScopeThe scope of this contract is defined by the efforts and tools required to support USCGC PATOKA ( WLR 75408 ). The Contractor shall provide all labor , materials , and tools necessary to remove insulation , remediate mold ( if found ), reinsulate leaving no air gaps between false bulkhead and bulkhead , and install new aluminum panels . OBJECTIVEThe goal is to return CGC PATOKA air quality and habitability conditions to acceptable conditions . APPLICABLE DOCUMENTSCompliance DocumentsThe following documents provide specifications , standards , or guidelines that must be complied with in order to meet the requirements of this contract : Surface Forces Logistics Center Standard Specification ( SFLC Std Spec ) 0000 , 2022 , General Requirements29 Code of Federal Regulations ( CFR ) Part 1915 , Occupational Safety and Health Standards for ShipyardsASTM International ( ASTM ) F683 , 2003 , Standard Practice for Selection and Application of Thermal Insulation for Piping and MachineryNAVSEA Drawing 804 - 5959214 , Rev -, Piping Insulation - Installation DetailsSPECIFIC REQUIREMENTS / TASKSUnless otherwise stated , this contract applies to on - site support for USCGC PATOKA ( WLR 75408 ) in GREENVILLE , MS . 2 . 1 Remediate MoldThe Contractor shall perform any inspections or evaluations , as deemed necessary , to determine best path forward prior to commencing work . The Contractor shall remove all overhead and bulkhead panels in the following spaces ( all square footage is an estimate ): Bridge ( 234 sq . ft .) OIC Stateroom ( 330 sq . ft .) CPO Stateroom ( 275 sq . ft .) CPO Head ( 40 sq . ft .) CPO Passageway ( 25 sq . ft ) Main Deck PassagewayLog Office ( 182 sq . ft .) Crew Berthing ( 490 sq . ft .) Crew Head ( 84 sq ft ) Laundry ( 91 sq . ft .) Galley ( 79 . 6 sq . ft .) Messdeck ( 240 sq . ft .) The contractor shall remove any interferences such as structures , lights , outlets , speakers , and alarms and work with the Engineer Petty Officer ( EPO ) or the EPO ’ s designated representative to ensure power is properly secured before removal . The Contractor shall remove and dispose of all existing insulation in areas designated in section 2 . 1 . 1 . The Contractor shall remove all existing wood support beams in areas designated in section 2 . 1 . 1 . The Contractor shall test for mold in in areas designated in section 2 . 1 . 1 .. The Contractor shall remediate all mold discovered . Contractor shalluse industry standard means of remediation that are approved by federal and state agencies governing mold remediation . The Contractor shall conduct mold testing to the areas designated in section 2 . 1 . 1 to ensure mold was properly remediated . Testing shall include industry standard means of surface testing as well as air quality testing in the designated spaces in section 2 . 1 . 1 . The Contractor shall install plastic sheeting to all the areas where the bulkhead and overhead panels were removed to prevent insulation dust / debris falling on the crew while underway . 2 . 2 Test Thoroughly and DocumentThe Contractor shall ensure the cutter is fully remediated of mold by preforming a walkthrough of all spaces identified in section 2 . 1 . 3 . with the Engineer Petty Officer ( EPO ) or the EPO ’ s designated representative . 2 . 2 . 1 The Contractor shall provide a trip report documenting all findings no later than 7 days after returning to the home office . Reinsulating and PanelingProtective measures . The Contractor shall furnish and install all protective coverings to seal off and protect all non - affected vessel ' s components , equipment , and spaces near the work area against contamination during the performance of work . Upon completion of work , the Contractor shall remove all installed protective measures , inspect for the presence of contamination , and return all contaminated equipment , components , and spaces to original condition of cleanliness . Removal . The Contractor shall remove all existing insulation material over the designated pipe surfaces , including associated pipe hangers , valves , fittings , and flanges . New insulation installation - interior refrigerant , hot water and cold and chill water piping systems ( Temperature Range : - 20 to + 180 Deg . F ). The Contractor shall install new insulation material over the exposed pipe surfaces , including associated pipe hangers , valves , fittings , and flanges , in accordance with details in NAVSEA Drawing 804 - 5959214 ; select appropriate insulation materials and thicknesses for the application and temperature ranges specified in ASTM F683 , Tables S1 . 1 and 5 . Preservation . The Contractor shall paint the newly installed insulation system , in accordance with SFLC Std Spec 6310 , using the system specified for “ Insulation Surfaces , Fiberglass Sheet / Closed Cell PVC Foam ” in Appendix B ( Cutter and Boat Interior Paint Systems ). Operational test , post repairs . After completion of work , the Contractor shall thoroughly test , in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed , used , repaired , altered , or installed to be in satisfactory operating condition . Submit a CFR . The Contractor shall install new wood support beams in areas designated in section 2 . 1 . 1 . The Contractor shall install new bulkhead insulation that fills the air gap between the false bulkhead panels and the bulkhead meeting Coast Guard Specification 164 . 109 / 37 / 0 in areas designated in section 2 . 1 . 1 . The Contractor shall install new aluminum false bulkhead paneling in areas designated in section 2 . 1 . 1 .. The Contractor shall reinstall any interferences and ensure electrical components have the proper covers installed . CONTRACTOR PERSONNEL3 . 1 The Contractor shall provide qualified personnel to perform all requirements specified in this SOW . OTHER APPLICABLE CONDITIONSInterferencesThe Contractor must handle all interferences in accordance with SFLC Std Spec 0000 , paragraph 3 . ( Interferences ). Known interferences include , but are not limited to the following : OutletsLightingFan unitsAlarmsSpeakersSwitchesWindowsPERIOD ofPERFORMANCE : 16FEB2026 - 02MAR2026The period of performance for this contract shall not exceed 14 calendar days from the date of award unless approved by the contracting officer . 4 . 3 PLACE OF PERFORMANCEThe primary place of performance will be at CGC PATOKA at 1797 Harbor Front RD , Greenville , MS 38701 unless an alternate location is approved by the Coast Guard . 4 . 4 HOURS OF OPERATIONContractor employees shall generally perform all work between the hours of 0730 and 1600 EST , Monday through Friday ( except Federal holidays ). However , there may be occasions when Contractor employees shall be required to work other than normal business hours , including weekends and holidays , to fulfill requirements under this SOW . Precise times may be negotiated with the cutter Engineer Petty Officer ( EPO ) as scheduling is subject to ship ’ s operations . 4 . 5 TRAVELContractor travel may be required to support this requirement . All travel required by this task shall be provided by the Contractor at no expense to the Government . 5 . 0 GOVERNMENT FURNISHED RESOURCESNONE6 . 0 CONTRACTOR FURNISHED PROPERTYThe Contractor shall furnish all materials , equipment , and services necessary to fulfill the requirements of this contract , except for the Government Furnished Resources specified in Section 5 . 0 . GOVERNMENT ACCEPTANCE PERIODThe EPO will inspect deliverables prior to acceptance and provide the contractor with an e - mail that provides documented reasons for non - acceptance . If the deliverable is acceptable , the EPO will send an e - mail to the Contractor notifying it that the deliverable has been accepted . 8 . 0 DELIVERABLESThe Contractor shall provide a trip report and warranty no later than 7 days after returning to the home office . 9 . 0 NOTESList of known suppliers . Below is a list of known manufacturers / suppliers : Temperature Inc . 7500Appling Center DrMemphis TX 38133 ( 901 ) 388 - 4706 O ( 901 ) 331 - 8683 CIndustrial Commercial Marine ( ICM ) ( 410 ) 771 - 8070Advanced Thermal Products ( ATP ), Inc . ( 800 ) 826 - 8417 |
Location
Country | United States of America (USA) |
State | Mississippi |
Source
Source | Mississippi Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Bridge, Seaport, Government, Geothermal, Metal, Power Generation (CCGT), Warehouse, Steel, Commercial, Residential |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
