USCGC Kimball AC Overhaul
Sector: Warehouse • Location: Hawaii, United States of America
Source: Hawaii Purchasing Group
General Requirements1 . SCOPE1 . 1 Intent . This standard specification invokes general requirements for conducting vessel repairsperformed by commercial contractors at Coast Guard Base Honolulu aboard Coast Guard Cutter Kimball . 2 . REFERENCESCOAST GUARD DRAWINGSNoneCOAST GUARD PUBLICATIONSSurface Forces Logistics Center Standard
- Status
- Closed
- Sector
- Warehouse, Commercial
- Location
- Hawaii, United States of America
- Updated
- 3 Nov 2026
- Source
- Hawaii Purchasing Group
ConstructChat
Ask ConstructChat about USCGC Kimball AC Overhaul
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | General Requirements1 . SCOPE1 . 1 Intent . This standard specification invokes general requirements for conducting vessel repairsperformed by commercial contractors at Coast Guard Base Honolulu aboard Coast Guard Cutter Kimball . 2 . REFERENCESCOAST GUARD DRAWINGSNoneCOAST GUARD PUBLICATIONSSurface Forces Logistics Center Standard Specification 0000 ( SFLC Std Spec 0000 ), 2022 , General RequirementsSurface Forces Logistics Center Standard Specification 0740 ( SFLC Std Spec 0740 ), 2022 , Welding and Allied ProcessesSurface Forces Logistics Center Standard Specification 5550 ( SFLC Std Spec 5550 ), 2022 , FirePrevention and ResponseOTHER REFERENCESNone3 . REQUIREMENTS3 . 1 General . The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and inthis item , as applicable , during the performance of this availability . The requirements of this WI applies toall work under the scope of this contract , whether explicitly stated in all following work items or not , andto all other work subsequently authorized by changes , modifications , or extensions to the contract . 3 . 2 Contractor - provided fire watch personnel . The Contractor must provide fire watch personnel andequipment . 3 . 3 Welding and brazing requirements . The Contractor must perform all welding and allied processes , andNDE in accordance with SFLC Std Spec 0740 . 3 . 4 Fire Prevention Specification . The Contractor must submit a Fire Prevention Plan in accordance withparagraph 3 . 1 of SFLC Standard Spec 55503 . 5 Period of Performance . 16FEB2026 to 06MAR2026 |
Location
Country | United States of America (USA) |
State | Hawaii |
Source
Source | Hawaii Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Warehouse, Commercial |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Warehouse tenders in United States of America
- 10K Capacity Forklift
- Notice of Intent to Award a NonCompetitive Procurement for Siemens Logistics High Speed Diverters
- NEW WAREHOUSE BUILDING FOR OCEAN COUNTY HEALTH DEPARTMENT
- 24C4 Warehouse Racking System
- Various Locations Sewer Replacement No. 9 [BID TABULATION]
- Millbrae Warehouse Loading Dock Repair
- Cargo Way Flush Line
- Southeast Water Pollution Control Plant Biosolids Digester F...
