Usfs Swim Dock Replacement - Sullivan Lake Campground, Washington
Combined synopsis/solicitation · Washington
Source: SAM.gov
This solicitation replaces the previously cancelled notice 1240BD26Q0003. Upon review of the market and initial offers, the Government has determined that HDPE modular structures are a technically acceptable and highly advantageous alternative to metal-frame construction. To ensure maximum practicable competition and provide all capable vendors—including those whose previous offers did not meet th
- Status
- Closed
- Sector
- Metal, Government, Raw Materials, Residential, Commercial
- Location
- Metaline Falls, Washington, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Usfs Swim Dock Replacement - Sullivan Lake Campground, Washington
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | combined synopsis/solicitation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This solicitation replaces the previously cancelled notice 1240BD26Q0003. Upon review of the market and initial offers, the Government has determined that HDPE modular structures are a technically acceptable and highly advantageous alternative to metal-frame construction. To ensure maximum practicable competition and provide all capable vendors—including those whose previous offers did not meet the original metal-only specification—an opportunity to bid on this revised requirement, the Government is re-soliciting this project. (i) This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. (ii) Description of Requirement: The USDA Forest Service, Colville National Forest, requires the removal and disposal of an existing swim dock and the furnishing and installation of a new replacement at Sullivan Lake Campground. Technical Choice: Offerors must select and quote only ONE material option: Option 1 (Metal Frame) or Option 2 (HDPE Modular). Location: Sullivan Lake Campground, Metaline Falls, WA. Evaluation: Award will be made to the responsible offeror whose quote, conforming to the solicitation, is the most advantageous to the Government, price and other factors considered. The Government will use comparative evaluation procedures per FAR 12.602. |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | Washington |
City | Metaline Falls |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Metal, Government, Raw Materials, Residential, Commercial |
Article published date | 2026-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Metal tenders in United States of America
- Token Creek Roof Replacements
- HVAC Ice Machine Servicing and Sheet Metal Fabrication
- Jail Courthouse Walkway Project
- RFP 887702021MF Rapid Response Fire Boat for Norfolk FireRescue
- Various Locations Sewer Replacement No. 9 [BID TABULATION]
- Millbrae Warehouse Loading Dock Repair
- Biosolids Digester Facilities - Southeast Treatment Plant T-...
- Electrical (C-10 License), San Francisco, San Mateo, Santa C...
