Uss Boxer (Lhd-4), Alco Model 251C Long Lead Time Material (Lltm) Replacement
Sector: Aerospace & Defense • Location: San Diego, CA
Source: SAM.gov
RFP Amendment 0001 is hereby posted to update the Product Description (Attachment J-1), see attachment. This is a Combined Synopsis/Solicitation for commercial products prepared in accordance with the format in Part 12. This announcement constitutes the only solicitation. A proposal is being requested from only one source. Request for Proposal (RFP) N5523626R009 is issued as a sole source procurem
- Status
- Prospective
- Sector
- Aerospace & Defense, Government, Commercial, Residential, Manufacturing (Industrial)
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Uss Boxer (Lhd-4), Alco Model 251C Long Lead Time Material (Lltm) Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | combined synopsis/solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | RFP Amendment 0001 is hereby posted to update the Product Description (Attachment J-1), see attachment. This is a Combined Synopsis/Solicitation for commercial products prepared in accordance with the format in Part 12. This announcement constitutes the only solicitation. A proposal is being requested from only one source. Request for Proposal (RFP) N5523626R009 is issued as a sole source procurement. The subject solicitation is being processed in accordance with FAR Part 12. The Government intends to solicit and contract with only one source, Fairbanks Morse Defense (referred to herein a s Fairbanks Morse) for the part listed on the Product Description (Attachment J-1), under the authority of FAR 12.102 on a sole source basis. This notice of intent is not a request for competitive proposals. Determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. The applicable North American Industry Classification System (NAICS) code is 333618 ? Other Engine Equipment Manufacturing. This solicitation incorporates provisions and clauses by reference. The full text of FAR and DFAR references, provisions and clauses may be accessed at https://acquisition.gov. Please see the attachment, 26R0009__USS_Boxer_RFP_Syn_Sol for the full combined solicitation/synopsis notice for this requirement. |
Original sector | Not Identified |
Location
Country | United States of America (USA) |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Aerospace & Defense, Government, Commercial, Residential, Manufacturing (Industrial) |
Article published date | 2026-06-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Aerospace & Defense tenders in San Diego, CA
- Commercial Industrial Services (Cis) Non-Skid Deck Covering Services Follow-On Mac-Idiq
- Uss Savannah Ship Service Diesel Generator Kit Direct Replacement Parts
- Uss Gabrielle Giffords (Lcs 10) Main Propulsion Diesel Engine (Mpde) Direct Replacement Parts
- Notice Of Intent To Award Sole Source To Exail
- Submarine Rescue Operations Maintenance Contractor (Sromc)
- Market Survey For Software Engineering Services - Seeking Industry Capability Statements From Seaport Small Businesses For Niwc Pac Code 532 Application Arsenal (Aa) Enterprise Engineering And Lifecycle Support
- Submarine Rescue Operations Maintenance Contractor (Sromc)
- Market Survey For Software Engineering Services - Seeking Industry Feedback On Draft Performance Work Statement (Pws) For Niwc Pac Code 532 Application Arsenal (Aa) Enterprise Engineering And Lifecycle Support
