VC System for Hubs
The scope, dates and status of this tender. A free account opens every field.
Source: Find a Tender Service (UK)
Due to Microsoft officially ending support for all Windows 10 devices in October 2025, all Teams applications running on CNC's existing surface hub devices became non-functional and insecure, therefore requiring CNC to replace the hubs with a new VC system ahead of the planned refresh during the 2026-27 financial year. Following the installation of the new VC system, we are seeking to install the
- Status
- Closed
- Sector
- Nuclear, Commercial
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Find a Tender Service (UK)
ConstructChat
Ask ConstructChat about VC System for Hubs
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Due to Microsoft officially ending support for all Windows 10 devices in October 2025, all Teams applications running on CNC's existing surface hub devices became non-functional and insecure, therefore requiring CNC to replace the hubs with a new VC system ahead of the planned refresh during the 2026-27 financial year. Following the installation of the new VC system, we are seeking to install the same VC system into the meeting rooms at the new Headquarters building at Harwell (budget covered by New HQ Project) and to move three existing VC's to the proposed new Sellafield Operational Unit Building, occupancy due in September 2026 (funding for the latter VCs will be provided by the Sellafield OU Project). CNC wish to ensure the VC system at Harwell and Sellafield are fully compliant with the rest of the estate, therefore are looking to direct award the contract with Agile Comms, the original Supplier. CNC need to ensure that any new installations to B150 and Sellafield are fully compliant with our security specifications and integrate and operate seamlessly with the current VC system. As the supplier who provided and installed the new VC system, Agile Comms have a complete understanding of the CNC infrastructure and are fully aware of the technical specifications required for the new VC system. Change in project Scope or Requirements - August 2026 The number of video conferencing units required for the new HQ has increased. In addition, the Business has requested that room panels be installed at our Griffin Park site for use with the existing video conferencing system. To ensure these additional requirements remain fully compliant and consistent with the wider estate, we intend to engage the original supplier, Agile Comms. |
Location
Country | United Kingdom (UK) |
Source
Source | Find a Tender Service (UK) |
URL |
More Details
Record type | Tender |
Sector | Nuclear, Commercial |
Article published date | 2026-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Nuclear tenders in United Kingdom
- Diagnostic and Capital Equipment and Related Accessories and Services
- Purchase of electronics pod
- HPB - Provision of Radioactive Waste Management Services (AGR Unique Ref. 34 F/W)
- University Interactions - NDA Research Portfolio - Single Supplier Framework
- Manufacturability Assessment of the PEGASUS Transport Package Design
- Collection of Chemical Waste and Paints (Hazardous and Non-Hazardous)
- Manufacture, Supply & Installation of Pipework System
- Manufacture, Supply & Installation of Pipework System
