logo

Vegetation Management - Weed Control

Bids closed Mar 2026 · Idaho · Last reported Mar 2026

Source: Idaho Purchasing Group

Tender
Closed

1 . The application location is a private ranch with an extensive aquatic habitat restoration project in progress , located near Baker , Idaho . See Appendix A – map . 2 . The area to be treated is approximately one hundred - eighty ( 180 ) acres total , though the actual area to be treated each year will vary

Status
Closed
Sector
Power Generation (CCGT)
Location
Idaho, United States of America
Updated
3 Nov 2026
Source
Idaho Purchasing Group

ConstructChat

Ask ConstructChat about Vegetation Management - Weed Control

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Vegetation Management - Weed Control” is a tender record in Taiyo, linked to the Power Generation (CCGT) sector. It is issued for works, goods, or services related to Idaho, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

1 . The application location is a private ranch with an extensive aquatic habitat restoration project in progress , located near Baker , Idaho . See Appendix A – map . 2 . The area to be treated is approximately one hundred - eighty ( 180 ) acres total , though the actual area to be treated each year will vary depending on the progress of an ongoing active construction project . Bids for this work should assume that the total project area will be treated twice each year , though the exact treatment area will be coordinated with IDFG prior to each biannual application . Targeted treatments within that area are expected rather than total coverage by herbicides . 3 . Qualified Contractors will hold a current Idaho Professional Pesticide Applicator License and will maintain a current license for the duration of the contract . The Contractor must also follow ISDA rules and regulations for the supervision of employees that don ’ t have an Idaho Applicator License . Treatment procedures and methods must follow guidance and recommendations in Bonneville Power Administration ’ s Habitat Improvement Programmatic Handbook https :// www . bpa . gov /-/ media / Aep / environmental - initiatives / habitat - improvement - program / habitatimprovement - program - handbook . pdf 4 . The nature of the site requires that the licensed weed applicator follow Bonneville Power Administration ’ s Habitat Improvement Programmatic ( HIP ) requirements for herbicide application . Specifications from HIP are included . See Attachment 5 – HIP 4 Herbicide Conservation Measures . 5 . The Contractor must be able to identify noxious weeds on the Idaho State Noxious Weed List and other species locally identified as non - native such as mullein and kochia and must be prepared to treat infestations of these species with herbicides . 6 . The Contractor must conduct herbicide - spraying procedures safely and in accordance with applicable label restrictions of the herbicide , the Conservation Measures set forth by BPA , and the laws and regulations of the State of Idaho . 7 . The Contractor must provide treatment to noxious and nonnative weed species including kochia , which may require more than one application ( more than one site visit ), per the direction of the Project Manager . 8 . The Contractor must treat noxious weeds within the treatment areas . Additionally , noxious weeds will be treated if identified outside the treatment area and within a 100 - ft . buffer of the treatment area at the discretion of the applicator . 9 . The Contractor must record and submit treatment data on treatment forms provided . B . Frequency and Duration 1 . The Contractor must apply herbicide treatments twice per year , once in the spring and once in the fall . ( April 1 to October 31 ). The Contract will span three ( 3 ) years initially with the option to extend two ( 2 ) additional years . Each year of the contract will include an option period to extend the contract by a year contingent on funding and appropriation . C . Work Period 1 . The Contractor must start the work in the spring of 2026 or as weather permits . The Contractor must attend a pre - work conference with the IDFG project manager before commencement of work , in order to obtain maps and discuss work plans and other considerations . The contractor work schedule must be acceptable to the IDFG project manager . 2 . Spraying operations shall be permitted only within one half hour before sunrise to one half hour after sunset each day , in above freezing temperatures . Working on weekends and holidays is acceptable with IDFG project manager approval .

Location

Country

United States of America (USA)

State

Idaho

Source

Source

Idaho Purchasing Group

URL

More Details

Record type

Tender

Sector

Power Generation (CCGT)

Article published date

2026-05-06

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender