Vertical Turbine Pump Replacement Project
One of 10,000+ tenders Taiyo tracks in Missouri.
Source: Missouri Purchasing Group
The City of Marceline is requesting proposals for the replacement of a vertical turbine pump at the Water Treatment Plant . The scope of work includes removing all the current pump located in the basement of the Water Treatment Plant , disposal of removed material and replaced with a vertical turbine pu
- Status
- Closed
- Sector
- Water Supply and Storage, Wind, Government, Metal, Steel
- Location
- Missouri, United States of America
- Updated
- 3 Nov 2026
- Source
- Missouri Purchasing Group
ConstructChat
Ask ConstructChat about Vertical Turbine Pump Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The City of Marceline is requesting proposals for the replacement of a vertical turbine pump at the Water Treatment Plant . The scope of work includes removing all the current pump located in the basement of the Water Treatment Plant , disposal of removed material and replaced with a vertical turbine pump . It is expected that the pump will need to be removed and replaced in sections based on its location . The proposal should include the following : • New Vertical Turbine Pump as specified below . • Labor Cost to remove and replace current pump ( Located in Basement of Water Treatment Facility ) • Freight • Expected Lead Time to receive new pump • Anticipated Project Time Line Vertical Turbine Pump Specifications : • Model : 14KKH • # of Stages : 5 • Flow Rate : 1500 GPM • Head : 360 • RPM : 1800 • Bowl Assembly : Flanged • Bowl Material : Cast Iron • Impeller Material : Bronze C903 • Bearing Material : Bronze C844 • Shaft Material : 416SS • Bolting Material : 316SS • Strainer : Galvanized Steel • Column Material : Carbon Steel • Column Diameter : 10 ” • Line shaft Material : Carbon Steel • Line Shaft Diameter : 1 . 5 ” • Bearing Material : Rubber • Bolting Material : 316SS • Line Shaft Sleeve : 304SS • Discharged Head Assembly : Packed Box CI • Head Size : 10W • Head Material : Cast Iron • Coupling Type : Hollow Shaft |
Location
Country | United States of America (USA) |
State | Missouri |
Source
Source | Missouri Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Wind, Government, Metal, Steel |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
