Voyageurs Pathway – Leamy Lake Discharge - Pedestrian Bridge Reconstruction, Gatineau
Source: Canada Buy and Sell
Project Description Voyageurs Pathway – Leamy Lake Discharge - Pedestrian Bridge Reconstruction, Gatineau Project concerns the replacement of an existing pedestrian bridge with a 65 metres long one-span steel prefabricated bridge at Leamy Lake Discharge (Gatineau Boom) near Fournier Boulevard in Gatineau. Construction works include the mobilisation/demobilisation, including site clean-up and re-in
Tender Information FAQ
Tender Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Awarded |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Project Description Voyageurs Pathway – Leamy Lake Discharge - Pedestrian Bridge Reconstruction, Gatineau Project concerns the replacement of an existing pedestrian bridge with a 65 metres long one-span steel prefabricated bridge at Leamy Lake Discharge (Gatineau Boom) near Fournier Boulevard in Gatineau. Construction works include the mobilisation/demobilisation, including site clean-up and re-instatement of damaged areas, environmental protection measures and other related works, pedestrian pathway detour on Fournier Boulevard to maintain pathway traffic, the entire demolition of the existing superstructure and the partial demolition of piers for the existing bridge, the installation of the piles and pier caps, the design, fabrication and installation of the prefabricated bridge, all works related to the excavation and transportation of contaminated soil so to eliminate them towards authorized sites, all works related to the installation of reinforced earth retaining walls and of rip-rap, of a belvedere with landscape on the side of the east approach, and backfill, grading and levelling, pathway foundation asphalting, sodding, seeding, etc. Take note that no construction work is allowed under the natural high water line (NHWL) or into or over waterways from 1st April to 15th of July due to environmental constraints. However construction work can be executed behind existing abutments if it does not affect the waterways. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
