Vy-Missisquoi Nwr-Parking Lot Maint
Solicitation · United States of America
Source: SAM.gov
VY-MISSISQUOI NWR-PARKING LOT MAINT The Missisquoi NWR requires its visitor¿s center and staff parking lot asphalt surface to be maintained to prevent degradation and improve striping visibility. The ~1.0 acre asphalt parking lot was created when the new refuge office and visitor's center was built in 2006. Maintenance was completed in 2019. Since then, cold winters with freeze-thaw conditions and
- Status
- Prospective
- Sector
- Bridge, Commercial, Car parking, Residential, Automotive, Road
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Vy-Missisquoi Nwr-Parking Lot Maint
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | VY-MISSISQUOI NWR-PARKING LOT MAINT The Missisquoi NWR requires its visitor¿s center and staff parking lot asphalt surface to be maintained to prevent degradation and improve striping visibility. The ~1.0 acre asphalt parking lot was created when the new refuge office and visitor's center was built in 2006. Maintenance was completed in 2019. Since then, cold winters with freeze-thaw conditions and regular wear and tear have created cracks in the asphalt surface and worn away the parking lot striping on the surface. To prevent continued degradation the refuge requires the asphalt to be sealed, cracks filled and striping reapplied. The work to be completed will be to the ~1.0 acre visitor's center and refuge staff parking lot. The following work will be accomplished: 1. Clean and prepare the entire asphalt surface to be seal coated. 2. Crack fill any cracks as needed with hot rubberized crack filler. 3. Apply one coat of commercial grade asphalt sealer to the entire asphalt surface. 4. Re-stripe all paring areas to match existing layout. 5. Provide cones, sawhorses or other traffic management supplies to direct visitor's to separate parking area at refuge shop facility And other requirements as defined by the attached Scope of Work. Site Visit: June 23,2026, at 10:00 AM EDT. POC: Chris Whitaker, christopher_whitaker@fws.gov, or (802)868-4781 Questions Due: June 24, 2026 at 3:00 PM EDT, to Bill Koski, Contract Specialist, william_koski@ios.doi.gov Quotes Due: July 3, 2026 at 3:00 PM EDT, to Bill Koski, Contract Specialist, william_koski@ios.doi.gov |
Original sector | Construction |
Location
Country | United States of America (USA) |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Bridge, Commercial, Car parking, Residential, Automotive, Road |
Article published date | 2026-06-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
