W722 - Longbridge Weir Hydroelectric Plant Maintenance
Complete · United Kingdom
Source: Open Contracting Data Standard (OCDS)
The Longbridge Weir Hydropower House was constructed in 2011 to generate renewable electricity, primarily for the Council House. Derwent Hydroelectric Power Ltd was the original designer and constructor of the installation and has provided operation and maintenance services since commissioning. The plant has now been operational for approximately 14 years. As it approaches the later stages of its
- Status
- Closed
- Sector
- Hydro, Power Generation (CCGT), Commercial
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about W722 - Longbridge Weir Hydroelectric Plant Maintenance
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Longbridge Weir Hydropower House was constructed in 2011 to generate renewable electricity, primarily for the Council House. Derwent Hydroelectric Power Ltd was the original designer and constructor of the installation and has provided operation and maintenance services since commissioning. The plant has now been operational for approximately 14 years. As it approaches the later stages of its asset lifecycle, several major components are at increased risk of failure due to age and will require replacement within the next five years. Ongoing operation and maintenance therefore require specialist technical knowledge of the original design and construction of the installation. Accordingly, a direct award is permitted under the Procurement Act 2023, Schedule 5, item 6(a), as competition is absent for technical reasons and only a particular supplier can supply the required services. The market for contractors capable of maintaining and upgrading a small-scale hydropower installation of this nature is extremely limited. The plant requires a cost-effective 24-hour emergency response capability, which most specialist providers are unable to deliver. Derwent Hydroelectric Power Ltd is locally based, enabling this requirement to be met. As the original constructor, the supplier also has detailed and unique knowledge of the plant, presenting a significant technical barrier to alternative providers. The small scale of the installation further reduces commercial viability for other contractors. These market conditions are not expected to change. |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Hydro, Power Generation (CCGT), Commercial |
Article published date | 2026-04-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Hydro tenders in United Kingdom
- OO Works - Seagrass Planting SEPD - Multi Site 1226
- Shetland 2 HVDC Converter Technology
- OO Services - Woodland Restoration - SEPD 0327
- NEPO210 Highways Surfacing Works
- LT360 Spittal to Peterhead HVDC Cables (Construction) - Multi-site 1229
- The Mercian Trust Shire Oak Academy Science Block Window Replacement
- FW Supply & Deliver - 11kV Indoor Switchgear - Multi Site 0637
- Reservoir Act S10 Statutory Works - Reprofiling of Reservoir Dam at Osbornes Pond, Shipley Country Park
