logo

W722 - Longbridge Weir Hydroelectric Plant Maintenance

Complete · United Kingdom

Source: Open Contracting Data Standard (OCDS)

Tender
Complete

The Longbridge Weir Hydropower House was constructed in 2011 to generate renewable electricity, primarily for the Council House. Derwent Hydroelectric Power Ltd was the original designer and constructor of the installation and has provided operation and maintenance services since commissioning. The plant has now been operational for approximately 14 years. As it approaches the later stages of its

Status
Closed
Sector
Hydro, Power Generation (CCGT), Commercial
Location
United Kingdom
Updated
3 Nov 2026
Source
Open Contracting Data Standard (OCDS)

ConstructChat

Ask ConstructChat about W722 - Longbridge Weir Hydroelectric Plant Maintenance

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “W722 - Longbridge Weir Hydroelectric Plant Maintenance” is a tender record in Taiyo, linked to the Hydro sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Longbridge Weir Hydropower House was constructed in 2011 to generate renewable electricity, primarily for the Council House. Derwent Hydroelectric Power Ltd was the original designer and constructor of the installation and has provided operation and maintenance services since commissioning. The plant has now been operational for approximately 14 years. As it approaches the later stages of its asset lifecycle, several major components are at increased risk of failure due to age and will require replacement within the next five years. Ongoing operation and maintenance therefore require specialist technical knowledge of the original design and construction of the installation. Accordingly, a direct award is permitted under the Procurement Act 2023, Schedule 5, item 6(a), as competition is absent for technical reasons and only a particular supplier can supply the required services. The market for contractors capable of maintaining and upgrading a small-scale hydropower installation of this nature is extremely limited. The plant requires a cost-effective 24-hour emergency response capability, which most specialist providers are unable to deliver. Derwent Hydroelectric Power Ltd is locally based, enabling this requirement to be met. As the original constructor, the supplier also has detailed and unique knowledge of the plant, presenting a significant technical barrier to alternative providers. The small scale of the installation further reduces commercial viability for other contractors. These market conditions are not expected to change.

Location

Country

United Kingdom (UK)

Source

Source

Open Contracting Data Standard (OCDS)

URL

More Details

Record type

Tender

Sector

Hydro, Power Generation (CCGT), Commercial

Article published date

2026-04-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender