logo

W9127N26Qa145 - Ph2 Blade Seals Replacement For Bonneville Dam

One of 10,000+ tenders Taiyo tracks in Oregon.

Source: SAM.gov

Tender
Solicitation

GENERAL STATEMENT US Army Corps of Engineers, Portland District, Bonneville Lock and Dam are soliciting for the purchase and installation of blade seals for Powerhouse II Main Unit Kaplan turbines. The turbine runners are 5-bladed vertical axis Kaplans. The contractor will supply and i

Status
Prospective
Sector
Aerospace & Defense, Hydro, Wind, Steel, Government, Residential, Commercial, Manufacturing (Industrial)
Location
Oregon, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about W9127N26Qa145 - Ph2 Blade Seals Replacement For Bonneville Dam

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “W9127N26Qa145 - Ph2 Blade Seals Replacement For Bonneville Dam” is a tender record in Taiyo, linked to the Aerospace & Defense sector. It is issued for works, goods, or services related to Oregon, United States of America.

Participants

Not available for this record.

Status

Original status

solicitation

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

**Updated to add the RFI Log and Reference Drawings. See the Attachments section for the newly added documents.** GENERAL STATEMENT US Army Corps of Engineers, Portland District, Bonneville Lock and Dam are soliciting for the purchase and installation of blade seals for Powerhouse II Main Unit Kaplan turbines. The turbine runners are 5-bladed vertical axis Kaplans. The contractor will supply and install turbine blade seals on the Kaplan turbine of Main Unit 16. The second set of blade seals for Unit 17 is optional, as defined in this Performance Work Statement. The contractor will provide seals based on drawings and dimensions provided by the Government. The Government requests expedited fabrication, delivery, and installation at the earliest practicable opportunity following contract award. The Government anticipates contract award on or about 9/30/2026. This date is for planning purposes only and does not alter the Contractors performance obligations, which begin upon contract award. PERFORMANCE STANDARDS AND GUIDELINE REQUIREMENTS The Contractor shall furnish all supervision, labor, equipment, materials necessary to perform the work required under these specifications except for those items specifically identified as government provided. The Contractor shall place all trash and litter pickup in dumpsters located on the project. Telephone service will not be provided. The Contractor will furnish, deliver, and install newly manufactured Kaplan blade seals and all accessories at Bonneville Lock and Dam as detailed in this PWS. Contractor shall also provide required documentation as stated in section 5.1.3 of this PWS. Description of Supply and Service Supply Turbine Blade Seals. The Contractor is responsible for designing and fabricating one-piece solid seals for five-bladed Kaplan turbine runners. The seals are required to have redundant sealing edges, no split, and field-molded solid at site. No gluing, cold bonding, or hotbonding using additional material are permitted. The seals will need to be bonded without any external additional material (adhesive or elastomer) to ensure identical material properties across the entire seal and geometric continuity of the seal edges. The nominal packing size will have an OD of 45.252-inch and an ID of 43.993-inch. The blade seals are original to the 1980s installation and final seal dimensions are to be verified prior to delivery and installation. Approximate dimensions are provided herein for pricing purposes only. The seal housing (turbine hub bore and turbine blade trunnion sleeve) dimensions will be confirmed prior to the supplier coming to site for installation. For compatibility with material selection, the outer surface the seal will be against is cast steel. The inner surface of the blade seal housing is stainless steel. The seals shall be designed to fit within the existing packing box dimensions as shown on the supplied reference drawings: Drawing Description Number 330 - 5 X A Runner Hub Assy Sect 4296-JL-1 Follower (Seal Ring) 6532-T-2 Runner Hub Assy Plan 4296-JO-1 Runner Hub Assy Plan 4296-JM-1 Blade 6530-CR-1 Runner Hub 6529-BB-1 ** See solicitation document for more details **

Original sector

Not Identified

Location

Country

United States of America (USA)

State

Oregon

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Aerospace & Defense, Hydro, Wind, Steel, Government, Residential, Commercial, Manufacturing (Industrial)

Article published date

2026-09-17

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender