W9127N27Ba011 - John Day Dam Unit 10 Packing Box Replacement
Sector: Hydro • Location: JOHN DAY DAM, SHERMAN COUNTY, OREGONTHE JOHN DAY DAM ON THE COLUMBIA RIVER BETWEEN SHERMAN COUNTY, OREGON, AND KLICKITAT COUNTY, WASHINGTON.
Source: SAM.gov
PROJECT TITLE: JOHN DAY UNIT 10 PACKING BOX REPLACEMENTPROJECT LOCATION: JOHN DAY DAM, SHERMAN COUNTY, OREGONTHIS IS A FULL AND OPEN PROCUREMENT. IN ACCORDANCE WITH RFO 19.110, THIS PROJECT REQUIRES THE HUBZONE 10% PRICE EVALUATION.THE JOHN DAY DAM ON THE COLUMBIA RIVER BETWEEN SHERMAN COUNTY, OREGON, AND KLICKITAT COUNTY, WASHINGTON.THE ESTIMATED MAGNITUDE OF CONSTRUCTION IS BETWEEN $500,000.00 A
- Status
- Prospective
- Sector
- Hydro, Aerospace & Defense, Residential, Commercial
- Location
- JOHN DAY DAM, SHERMAN COUNTY, OREGONTHE JOHN DAY DAM ON THE COLUMBIA RIVER BETWEEN SHERMAN COUNTY, OREGON, AND KLICKITAT COUNTY, WASHINGTON.
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about W9127N27Ba011 - John Day Dam Unit 10 Packing Box Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | PROJECT TITLE: JOHN DAY UNIT 10 PACKING BOX REPLACEMENTPROJECT LOCATION: JOHN DAY DAM, SHERMAN COUNTY, OREGONTHIS IS A FULL AND OPEN PROCUREMENT. IN ACCORDANCE WITH RFO 19.110, THIS PROJECT REQUIRES THE HUBZONE 10% PRICE EVALUATION.THE JOHN DAY DAM ON THE COLUMBIA RIVER BETWEEN SHERMAN COUNTY, OREGON, AND KLICKITAT COUNTY, WASHINGTON.THE ESTIMATED MAGNITUDE OF CONSTRUCTION IS BETWEEN $500,000.00 AND $1,000,000.00.THE NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE FOR THIS ACTION IS 237990; OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION WITH A SMALL BUSINESS SIZE STANDARD OF $45M.AS PRESCRIBED IN DFARS 204.7504(A), THIS REQUIREMENT INCLUDES DFARS CLAUSE 252.204-7021 COMPLIANCE WITH THE CYBERSECURITY MATURITY MODEL CERTIFICATION (CMMC) LEVEL REQUIREMENTS. THE CMMC LEVEL REQUIRED BY THIS SOLICITATION IS CMMC LEVEL 1.BID OPENING WILL OCCUR ONE (1) HOUR AFTER BID CLOSING AT 2:00 PM PST DECEMBER 4TH, 2026. |
Original sector | Construction |
Location
Country | JOHN DAY DAM, SHERMAN COUNTY, OREGONTHE JOHN DAY DAM ON THE COLUMBIA RIVER BETWEEN SHERMAN COUNTY, OREGON, AND KLICKITAT COUNTY, WASHINGTON. |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Hydro, Aerospace & Defense, Residential, Commercial |
Article published date | 2026-10-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
