W912DY26RA032
Closed · Alabama · Last reported Jan 2026
Source: Alabama Purchasing Group
The Veteran ? s Administration has tasked the US Army Corps of Engineers Engineering and Support Center , Huntsville to initiate a Facility Reduction requirement at their Veteran ? s Medical Center facility in Palo Alto , California . One building is considered excess to the center ? s needs . The purpose of this
- Status
- Closed
- Sector
- Aerospace & Defense, Hospital, Commercial
- Location
- Alabama, United States of America
- Updated
- 3 Nov 2026
- Source
- Alabama Purchasing Group
ConstructChat
Ask ConstructChat about W912DY26RA032
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Veteran ? s Administration has tasked the US Army Corps of Engineers Engineering and Support Center , Huntsville to initiate a Facility Reduction requirement at their Veteran ? s Medical Center facility in Palo Alto , California . One building is considered excess to the center ? s needs . The purpose of this contract is to procure Pre - demolition surveys according to the requirements set forth in this Performance Work Statement ( PWS ). The objective is to plan and complete the environmental sampling of a facility at the installation . The structure of concern is Building 54 . The sampling will determine ACM and ORM materials and complete a Waste Stream Analysis for RCRA 8 metals , lead - based paint ( LBP ) and PCB ? s - in - paint for those parts of the structure currently identified as potentially having any painted components . Following sampling , the Contractor shall be able to completely quantify the environmental contamination present and the methods required to remove and dispose of said contamination in a safe manner . All sampling shall be planned and performed in accordance with Federal , State , and local regulations for the installation . All recommendations for follow - on actions shall also be in accordance with Federal , State , and local regulations . Laboratory testing and analysis shall be completed within 35 workdays following the respective site sampling field activity completion . The results of the site investigation and sampling effort will be provided in an individual Pre - Demolition Assessment Report for the installation that will be submitted within 15 workdays following the receipt of sample results . The intent of this contract effort is to provide comprehensive sampling for all ACM / ORM materials to include the facility exterior , roof , basement / crawl spaces , etc . The Contractor shall make every reasonable effort to access these areas when present in each facility . The Report will specifically address any areas within given structures that were not accessible during the survey and state the size of the area not accessed , and current or immediate previous use of the area not sampled . Refer to the PWS and attached documents for requirement specifics . |
Location
Country | United States of America (USA) |
State | Alabama |
Source
Source | Alabama Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Aerospace & Defense, Hospital, Commercial |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Aerospace & Defense tenders in United States of America
- Indigent Defense Services for Misdemeanor Cases Public Defender
- Notice of Intent to Award a NonCompetitive Procurement for Siemens Logistics High Speed Diverters
- This is a Notification Only Continuing OnCall Architecture and Engineering Consulting Services W00486
- Electronic Gate Replacement
- INFORMATION TECHNOLOGY IT CONTINUING CONSULTING SERVICES
- Airport Terminal HVAC Improvements Phase II Vestibule Upgrades ReBid
- NonExclusive Airport Rental Car Concession
- Procurement Consulting Services
