Wallace Park Playground
The scope, dates and status of this tender. A free account opens every field.
Source: Missouri Purchasing Group
The selected contractor shall provide all labor , materials , equipment , and incidentals necessary to complete the project as described . The project will be delivered as a turnkey installation , ready for public use upon completion . All work shall comply with applicable ASTM , CPSC , and ADA standards for playgrou
- Status
- Closed
- Sector
- Metal, Car parking, Cement, Automotive
- Location
- Missouri, United States of America
- Updated
- 3 Nov 2026
- Source
- Missouri Purchasing Group
ConstructChat
Ask ConstructChat about Wallace Park Playground
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The selected contractor shall provide all labor , materials , equipment , and incidentals necessary to complete the project as described . The project will be delivered as a turnkey installation , ready for public use upon completion . All work shall comply with applicable ASTM , CPSC , and ADA standards for playground safety and accessibility , as well as all local codes and permitting requirements . Design Elements • Two distinct ADAAG - compliant playground structures : • Structure 1 ( Ages 2 – 5 ): Designed for early childhood development with lower deck heights , slide , sensory - rich play panels , and transfer points for accessibility . • Structure 2 ( Ages 5 – 12 ): Designed for older children with ramp accessibility , higher climbing features , slides , net climbers , and interactive play zones . • Ground - level sensory panels and activity components • Use of existing site elevations to integrate a hillside slide feature along with hillside climbing features . 27 Stand Alone Equipment • 2 Bay single post configuration w / tot arm • 2 Spinners ( one large - over 10 ’ diameter , one small ) • Rope climber • Surface mount musical instruments • Preferred material : Durable metal construction with high - quality powder coating and UV - 18 or better plastics Site Work and Installation The contractor will be responsible for : • Site grading as required to prepare for equipment installation and drainage improvements • Installation of an appropriate drainage system to support poured - in - place surfacing • Installation of concrete curbing , 5 ’ sidewalk around entire playground parameter , sidewalk connections , and any related site infrastructure necessary for ADA compliance • Installation of poured - in - place rubber surfacing across all play zones • Coordination with Park staff to maintain alignment with existing site elevations and design intent |
Location
Country | United States of America (USA) |
State | Missouri |
Source
Source | Missouri Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Metal, Car parking, Cement, Automotive |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
