Warehousing Support For Crsp
Sector: Warehouse • Location: Natick, Massachusetts, United States of America
Source: SAM.gov
See attached Solicitation. Here is the PWS: Performance Work Statement (PWS): Centralized Receiving and Shipping Point (CRSP) The contractor shall provide Two (2) appropriately trained, supply and services labor to establish, operate, perform, and manage centralized receiving and shipping point (CRSP). Work hours are 0700 1530, Monday through Friday (30min lunch alternating). CRSP tasks include is
- Status
- Prospective
- Sector
- Warehouse, Seaport, Commercial, Residential, Aerospace & Defense
- Location
- Natick, Massachusetts, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Warehousing Support For Crsp
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | combined synopsis/solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | See attached Solicitation. Here is the PWS: Performance Work Statement (PWS): Centralized Receiving and Shipping Point (CRSP) The contractor shall provide Two (2) appropriately trained, supply and services labor to establish, operate, perform, and manage centralized receiving and shipping point (CRSP). Work hours are 0700 1530, Monday through Friday (30min lunch alternating). CRSP tasks include issuing to personnel authorized by delegation of authority card, DA Form 1687 (electronic or manual form acceptable) maintained on file, receiving, unloading or diverting trucks, reviewing manifests, breaking out items, inspecting items, recording transactions, receiving push shipments, redirecting mis-shipments, inspecting, photographing and coordinating with the Installation Transportation Division (ITD). The contractor shall operate the Automated Manifest System (AMS). The contractor shall perform these functions in accordance with AR 710-2, DA PAM 710-2-2 AR 735-5. The contractor shall use material handling, motor transportation to distribute cargo to, or receive cargo from, other CRSPs, ports operations areas, or bases/camps in support of onward movement and retrograde. The contractor shall distribute and backhaul supplies and materials to supply activities on the installation. The contractor shall maintain complete visibility of all ISO containers moving to and from the CRSP and provide input to the Army Container Asset Management System (ACAMS). The contractor shall provide monthly Labor Hours worked per Attachment 0002 Hours Work Report. The contractor shall submit documents per the Contract Data Requirements List (CDRL) found in Attachments 0003 and 0004. Please note the contractor's Safety and Health Plan (CDRL 002) and Emergency Response Plan (CDRL 003) is due not later than (NLT) 60 days after contract award. |
Original sector | Not Identified |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Natick |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Warehouse, Seaport, Commercial, Residential, Aerospace & Defense |
Article published date | 2026-09-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Warehouse tenders in United States of America
- 10K Capacity Forklift
- Notice of Intent to Award a NonCompetitive Procurement for Siemens Logistics High Speed Diverters
- NEW WAREHOUSE BUILDING FOR OCEAN COUNTY HEALTH DEPARTMENT
- 24C4 Warehouse Racking System
- Various Locations Sewer Replacement No. 9 [BID TABULATION]
- Millbrae Warehouse Loading Dock Repair
- Cargo Way Flush Line
- Southeast Water Pollution Control Plant Biosolids Digester F...
