Warm Waste Pond
Sector: Power Generation (CCGT) • Location: Idaho, United States of America
Source: Idaho Purchasing Group
Expression of InterestWarm Waste Pond1 . INTRODUCTIONBattelle Energy Alliance , LLC ( BEA ) Management & Operating Contractor of the U . S . Department of Energy ( DOE ) owned Idaho National Laboratory ( INL ), is seeking an Expression of Interest ( EOI ) from qualified vendors for the construction of a new lined warm waste
- Status
- Closed
- Sector
- Power Generation (CCGT), Nuclear, Manufacturing (Industrial), Road
- Location
- Idaho, United States of America
- Updated
- 3 Nov 2026
- Source
- Idaho Purchasing Group
ConstructChat
Ask ConstructChat about Warm Waste Pond
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Expression of InterestWarm Waste Pond1 . INTRODUCTIONBattelle Energy Alliance , LLC ( BEA ) Management & Operating Contractor of the U . S . Department of Energy ( DOE ) owned Idaho National Laboratory ( INL ), is seeking an Expression of Interest ( EOI ) from qualified vendors for the construction of a new lined warm waste pond at the Advanced Test Reactor ( ATR ) Complex to support ongoing ATR operations . 2 . BACKGROUNDINL is a U . S . Department of Energy ( DOE ) national laboratory dedicated to nuclear energy , national security , and clean energy innovation . The ATR Complex requires an additional lined pond to expand the capacity and enhance resiliency . Subcontractors should expect compliance with applicable federal , state , and local requirements – including environmental , safety , and electrical standards – and INL site procedures and quality programs . The scope of work may include the following :• Pond footprint up to ~ 25 % larger than existing individual warm waste ponds .• CSPE - R primary geomembrane liner installation , including subgrade preparation , anchor trenches , and seam QA / QC .• HDPE secondary liner ( double - lined system ) with leak - detection layers and monitoring infrastructure .• Extension of the existing gravel road for construction access and long - term operations .• Extension of existing chain - link fence and security features around the new pond .• Power service to the new pond , including electrical distribution for monitoring , pumping , and controls .• Extension of the existing discharge line to the new pond with required tie - ins and isolation .• Leak detection system and redundant pumping system , including controls integration and performance testing . 3 . PROCESSThis EOI is the first step in identifying interested and qualified vendors . Responses may be used to inform the development of a formal solicitation list . Selected vendors may be invited to participate in a Request for Proposal ( RFP ) process for award consideration . 4 . SUBMITTAL REQUIREMENTSInterested vendors should submit an Expression of Interest that includes the following :• Company name and point of contact • Description of relevant capabilities and experience with earthwork and pond construction ; CSPE - R and HDPE geomembrane installation ; double - liner leak - detection systems ; industrial pumping and controls ; civil / site ( roads , rending ); and pipeline extensions in industrial settings .• NAICS codes and business size classification • Any existing DOE or federal contracting experience ( if applicable ) Deadline for submission : March 17 , 2026Submit to : Chase . Egbert @ inl . govOnly selected respondents , as determined by BEA , will receive an invitation to participate in the anticipated RFP solicitation . 5 . PROPRIETARY INFORMATIONBecause information received in response to this EOI may be business sensitive or proprietary to the responding party , respondents must mark information in their responses accordingly . |
Location
Country | United States of America (USA) |
State | Idaho |
Source
Source | Idaho Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT), Nuclear, Manufacturing (Industrial), Road |
Article published date | 2026-05-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Generation (CCGT) tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Security Hardware Services
- 23B49SR Marine Science Center Turtle Canopy
- Purchase and Supply of Engine Oil for the McIntosh Reciprocating Engine Project MREP
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- PreQualification of Bidders for Chaboya Improvements
