Washington & Casey Road Resurfacing
Sector: Waste Processing and Treatment • Location: Wisconsin, United States of America
Source: Wisconsin Purchasing Group
Description : The Project includes the following Work : • General work on all roadway sections : o Traffic control o Clearing and grubbing as required within right - of - way o Temporary erosion control o Sawing asphalt o Salvaging topsoil , seeding , fertilizer / turf restoration o Pulverizing and regrading of existing
- Status
- Closed
- Sector
- Waste Processing and Treatment, Metal, Steel, Fertilizers, Water Supply and Storage, Cement, Road
- Location
- Wisconsin, United States of America
- Updated
- 3 Nov 2026
- Source
- Wisconsin Purchasing Group
ConstructChat
Ask ConstructChat about Washington & Casey Road Resurfacing
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Description : The Project includes the following Work : • General work on all roadway sections : o Traffic control o Clearing and grubbing as required within right - of - way o Temporary erosion control o Sawing asphalt o Salvaging topsoil , seeding , fertilizer / turf restoration o Pulverizing and regrading of existing asphalt pavement o Undistributed base aggregate as required o Shouldering and shoulder shaping o Asphalt paving o Undistributed geogrid and EBS as required o Placement of borrow for sideslope shaping as required o Ditching as required o Rip rap as required o All associated removals of culverts and driveway aprons as required o Replacement of storm sewer culverts with CMP and RCP and endwalls of various sizes • Resurfacing of approximately 10 , 700 lineal feet of roadway on Washington Road from CTH N to approximately 75 feet south of Hartzell Road intersection • Resurfacing of approximately 900 lineal feet of roadway on Hartzell Road from Washington Road to STH 59 • Resurfacing of approximately 11 , 200 lineal feet of roadway on Casey Road from STH 59 to CTH M • Resurfacing of approximately 470 lineal feet of roadway on W . Casey Connector Road from Casey Road to STH 59 • Bid Alternate A – Replacement of existing 5 ’ x9 ’ concrete box culvert and 72 ” CMP extensions with Contech # 6 ( 10 ’- 11 ” x 6 ’- 4 ”) aluminum box culvert on Casey Road ( STA 22 + 72 ) • Bid Alternate B – Replacement of existing 5 ’ x9 . 5 ’ concrete box culvert with Contech # 45 ( 19 ’- 10 ” x 7 ’- 10 ”) aluminum box culvert on Casey Road ( STA 54 + 27 ) • Bid Alternate C – Replacement of existing 2 . 65 ’ x3 ’ concrete box culvert with 34 ” x53 ” HERCP on Washington Road ( STA 557 + 08 ) • Bid Alternate D – Installation of approximately 23 , 500 lineal feet of VRAM on longitudinal joint between surface and binder on all paved roadway sections The anticipated substantial completion date is within 45 calendar days of pulverizing the roadways for Milestone A ( Washington Road and Hartzell Road ) and Milestone B ( Casey Road and W . Casey Connection Road ) or September 11 , 2026 ; whichever occurs first , and final completion date is September 25 , 2026 . |
Location
Country | United States of America (USA) |
State | Wisconsin |
Source
Source | Wisconsin Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Metal, Steel, Fertilizers, Water Supply and Storage, Cement, Road |
Article published date | 2026-05-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in United States of America
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Annual Construction Contract For Utility Replacement 2022A
- FY23 Sewer Rehabilitation
- Fire Station 32 ADA Restroom Improvements
- Foothills Trail East Puyallup McMillin Trailhead Improvements
- Pipeline Trail Phase 1 Project
