Washington Park Stormwater Capture Project - Engineering Design Services
One of 10,000+ tenders Taiyo tracks in California.
Source: California Purchasing Group
Under the federal Clean Water Act , the National Pollutant Discharge Elimination System ( NPDES ) permit program regulates pollutant discharges to protect water quality . As part of this framework , Total Maximum Daily Loads ( TMDLs ) set the maximum allowable pollutant loads for waterbodies and allocate those loads a
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government
- Location
- California, United States of America
- Updated
- 3 Nov 2026
- Source
- California Purchasing Group
ConstructChat
Ask ConstructChat about Washington Park Stormwater Capture Project - Engineering Design Services
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Under the federal Clean Water Act , the National Pollutant Discharge Elimination System ( NPDES ) permit program regulates pollutant discharges to protect water quality . As part of this framework , Total Maximum Daily Loads ( TMDLs ) set the maximum allowable pollutant loads for waterbodies and allocate those loads among contributing sources , including municipal separate storm sewer systems ( MS4s ). The City of Pasadena ’ s MS4 conveys dry - and stormwater flows to receiving waters , including the East Side Storm Drain , Rubio Wash , and the Rio Hondo Channel , all of which ultimately discharge to the Los Angeles River and are subject to TMDLs for bacteria , trash , metals , sediments , and other pollutants of concern . Compliance with the Los Angeles County MS4 Permit requires the City to implement cost - effective , multi - benefit stormwater management projects that achieve pollutant load reductions and advance watershed health . The City of Pasadena is leading the Washington Park Stormwater Capture Project to continue regional progress toward pollutant load reductions for bacteria and other priority pollutants in the East Side Storm Drain , Rubio Wash , and Rio Hondo watershed . Washington Park , located at the southeast corner of Washington Boulevard and El Molino Avenue , is uniquely positioned within the Rio Hondo watershed and offers substantial potential to improve water quality due to its proximity to existing storm drain infrastructure , its watershed linkage , and available city - owned space . A Project Feasibility Study , funded through the Los Angeles County Safe , Clean Water Program ’ s Technical Resources Program ( TRP ), has been completed and evaluated conceptual approaches for diverting stormwater from the adjacent East Side Storm Drain , filtering it through a pretreatment unit , and conveying it to an underground storage and groundwater recharge system . The preliminary concept evaluated in the study also explored opportunities for on - site bioretention / infiltration basins and gardens to enhance native vegetation and passive recreation opportunities . The Feasibility Study informs the RFP ’ s expectation that final design build upon the study ’ s findings while assessing additional alternatives that maximize water quality improvements , cost - effectiveness , and design efficiencies within site constraints . The site is on public property owned by the City of Pasadena and is located within the Rio Hondo watershed . The drainage area for the project is approximately 527 acres and is located within the City of Pasadena . The drainage area is contributed by the City of Pasadena ( 77 . 3 %) and the County of Los Angeles ( 22 . 7 %). |
Location
Country | United States of America (USA) |
State | California |
Source
Source | California Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
